space farmer girl busy farming

Chapter 1823 Putting on the Offshore Platform

Chapter 1823 Putting Offshore Platforms ([-])

After the component is removed from the big box, the crane commanded by the deputy housekeeper takes over, grasping the buckle connected by the steel cable to hang the component firmly in the air at a distance of one meter, and then Qi Ke puts the component and the crane together. They moved out of Qianhe Realm together, and placed them on the coast where the laser guided them under the command of Zhaolin.

It doesn't matter if it is a bit off, the components are always suspended in the air, the main purpose is to allow the crane to land stably, and then finely control the components to hang on the surface of the sea that is about to enter the sea, waiting for the next component to arrive.

After placing the first whole piece, Qi Ke returned to Qianhejing, moved out the second piece and the crane that held it, still using the laser to guide the placement, manipulated the crane to splice the two pieces together, and stabilized Can't wait for the next piece.

A complete basic platform alone occupies an area of ​​more than 5000 square meters, which does not include the distance and area required for the cranes that assist in splicing, so this cannot be done in a thousand lotus environment full of flowers and plants. If there is a big operation, if there is a place out of control, the flowers and plants will be damaged and the loss will be huge.

It doesn't matter on the coast, and it doesn't feel bad if these reefs are smashed.

Qi Ke transferred the components and cranes one by one to the outside of Qianhe, moving out a total of eight large pieces, and then a large number of engineering robots climbed up and down on these components, and finally assembled into a big rectangular guy.

After the assembly, it was a whole large plane suspended above the sea. After the energy block was installed and started, the bottom of the large plane, that is, the side facing the sea, began to move.

Each of the eight components stretches out a cylindrical giant leg to pierce the seabed continental shelf and break through the rock formation to reach the oil and gas layer.

This giant leg is not only to help the integrated platform stand firmly on the seabed, but also the outermost pipeline of the oil and gas collection pipeline.

As long as the deep seabed is rich in reserves, the eight giant legs can transform into eight collection pipelines, continuously filling the oil and gas storage tanks on the platform.

This is only the production capacity of the basic platform. Expansion modules can be installed on demand at any time to expand production. It is enough to imagine what a terrifying force the giant offshore platform will be when it is completed.

Qi Ke stood in front of the tent and watched the platform enter the sea from a distance of more than 400 meters. When he was thinking about how his giant legs would go deep into the bottom of the sea, he suddenly felt the reef under his feet shake violently.

"earthquake?!"

Qi Ke squatted down quickly, with his hands on the ground, maintaining a posture where he could jump up and run quickly if something went wrong.

It was only when she squatted down that she realized that the shock just now was still an earthquake but it could be called an earthquake. The small vibration caused by the platform's giant legs piercing into the rocks on the sea floor was more obvious when she was closer.

The wolves and the three leopards ran away early that night to open up and patrol new territories. The King and Da Huahua, who had been with Qi Ke on this reef all the time, rushed over after the first shock and clung to Qi Ke. Lie down on the ground.

Xiao Diao Youyu, who followed Qi Ke out of the spiritual realm, had been watching the excitement on the top of the tent, and now he also flew down and landed on her shoulders to add some weight to her.

One man and three beasts support each other, squatting firmly.

Zhao Lin didn't bother to remind Qi Ke to pay attention at this moment, since the first component was lifted out by the crane, most of her idle computing power was moved to it.

Launching an offshore platform is a delicate job. If the eight giant legs are positioned well, it can save unnecessary waste for subsequent oil and gas collection.

Oil and gas exist in a liquid state under high pressure. The topography of the seabed is changeable. There are high places and low places, and water flows to low places. Naturally, there are a lot of liquid oil and gas reserves in the low places. It is a good location where the collection pipe can be pierced.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like