I, who plundered the heavens, have a hundred thousand dead
Chapter 31 Engineering
Chapter 31 The Centennial Project
……
In the morning two days later, Li Yang welcomed a professional construction team.
In order to make use of his dead soldiers, Li Yang also took time to take a lap in the town yesterday, and then summoned 5 dead young people to return to Tagou Village in a car.
When these dead men were on Hong Kong Island before, they all had the experience of working on the construction site, so Li Yang called them out now, and he would soon be able to adapt to various jobs on the construction site.
Of course, if it involves some technical work, these dead men are still a little short of heat, but doing some manual work and chores is not a problem at all.
Since the drawings of his house have not yet been designed, the temporary work is only pouring nearly 300 meters of roads and filling a few acres of fish ponds with cement.
In two days, this fish pond has been dug with the cooperation of two excavators.
All that's left is to make the embankments out of steel and concrete around the fish ponds.
After all, the deepest part of the fish pond that Li Yang excavated was more than 3 meters, and even the dam next to it was more than 5 meters.
Such a deep fish pond will definitely not work if the dikes are not done well.
Therefore, Li Yang simply moved closer to the century-old project.
The entire fish pond should not only be covered with 20 cm of concrete, but also a beam should be added every few meters. At the same time, a layer of steel bars should be laid around the entire fish pond.
Preliminary calculations show that the cost of this fish pond alone will exceed the price of building a small western-style building in the countryside.
"Master Wang, the steel bars I bought, the building formwork, and the wood were all in place yesterday. How many days will it take for you to finish the steel bars and formwork? Can you do it in two days?"
Since Li Yang had planned to use his dead men as the main force for his house building from the very beginning, Li Yang bought all kinds of building materials new, and the materials were much more than originally planned. of.
At the same time, Li Yang also bought 3 brand new concrete mixers, and also bought a lot of other construction tools.
Some of these items have already been delivered, while others are still in transit.
Because many tools are ordered by Li Yang through the Internet, anyway, they are all transported by logistics.
Hearing Li Yang's question, the 50-year-old master was also a little helpless.
"Boss Li, I know you're in a hurry, but you have so many projects, how can you do it in two days, at least a week, and if it rains, the time will have to be postponed."
"It doesn't matter if it rains, as long as it's not pouring concrete, it's just a little rain, I'll just buy some big clinker films. In short, you can get me the steel bars and formwork as soon as possible. You know, I'm in a hurry. I still have a lot of work to do.”
In order to complete the initial construction work faster, Li Yang contracted the bundling steel bars and formwork of the fish pond dam to the other party according to the weight and area of the steel bars.
Because only in this way, these people will work more quickly, and they will not procrastinate like doing some work.
As for the five dead men that Li Yang summoned yesterday, they will start the concrete pouring of the road with a few nearby masons and idle laborers invited by Li Yang today.
The busy time has passed, and in the blink of an eye, 5 days later, in the previous two days, the main road in the village leading to the old house of Li Yang's old house of several hundred meters has been fully paved.
Next, it is necessary to wait for a maintenance period of ten days to be able to communicate with the heavy trucks, so the subsequent projects will also wait for the road to pass vehicles before construction can be carried out.
However, Li Yang and the temporary workers he invited will not be idle in the next few days. In the next few days, they will also pour the dams of the fish pond.
The materials for pouring the fish pond embankment have already been stacked around the fish pond embankment.
In the past few days, Li Yang himself has not been idle. In addition to patrolling various places every day, he communicates with the designer who designed the house for him through prestige.
At the same time, Li Yang also learned a lot of precautions in building construction during this communication. If he understands building construction drawings and so on.
Because when building the house next, Li Yang himself has to act as a construction worker.
After all, the house he saw, although it looked like a courtyard on the surface, had a large basement inside.
And this basement will continue to expand in the future.
Therefore, in the early stage of building foundation construction, Li Yang had to make some preparations for the subsequent construction.
And this specific construction is Li Yang's own secret, so all the specific work, including construction, must be Li Yang's dead man.
Since none of Li Yang's current dead has the ability to build construction, he has to rely on himself for the time being.
(End of this chapter)
……
In the morning two days later, Li Yang welcomed a professional construction team.
In order to make use of his dead soldiers, Li Yang also took time to take a lap in the town yesterday, and then summoned 5 dead young people to return to Tagou Village in a car.
When these dead men were on Hong Kong Island before, they all had the experience of working on the construction site, so Li Yang called them out now, and he would soon be able to adapt to various jobs on the construction site.
Of course, if it involves some technical work, these dead men are still a little short of heat, but doing some manual work and chores is not a problem at all.
Since the drawings of his house have not yet been designed, the temporary work is only pouring nearly 300 meters of roads and filling a few acres of fish ponds with cement.
In two days, this fish pond has been dug with the cooperation of two excavators.
All that's left is to make the embankments out of steel and concrete around the fish ponds.
After all, the deepest part of the fish pond that Li Yang excavated was more than 3 meters, and even the dam next to it was more than 5 meters.
Such a deep fish pond will definitely not work if the dikes are not done well.
Therefore, Li Yang simply moved closer to the century-old project.
The entire fish pond should not only be covered with 20 cm of concrete, but also a beam should be added every few meters. At the same time, a layer of steel bars should be laid around the entire fish pond.
Preliminary calculations show that the cost of this fish pond alone will exceed the price of building a small western-style building in the countryside.
"Master Wang, the steel bars I bought, the building formwork, and the wood were all in place yesterday. How many days will it take for you to finish the steel bars and formwork? Can you do it in two days?"
Since Li Yang had planned to use his dead men as the main force for his house building from the very beginning, Li Yang bought all kinds of building materials new, and the materials were much more than originally planned. of.
At the same time, Li Yang also bought 3 brand new concrete mixers, and also bought a lot of other construction tools.
Some of these items have already been delivered, while others are still in transit.
Because many tools are ordered by Li Yang through the Internet, anyway, they are all transported by logistics.
Hearing Li Yang's question, the 50-year-old master was also a little helpless.
"Boss Li, I know you're in a hurry, but you have so many projects, how can you do it in two days, at least a week, and if it rains, the time will have to be postponed."
"It doesn't matter if it rains, as long as it's not pouring concrete, it's just a little rain, I'll just buy some big clinker films. In short, you can get me the steel bars and formwork as soon as possible. You know, I'm in a hurry. I still have a lot of work to do.”
In order to complete the initial construction work faster, Li Yang contracted the bundling steel bars and formwork of the fish pond dam to the other party according to the weight and area of the steel bars.
Because only in this way, these people will work more quickly, and they will not procrastinate like doing some work.
As for the five dead men that Li Yang summoned yesterday, they will start the concrete pouring of the road with a few nearby masons and idle laborers invited by Li Yang today.
The busy time has passed, and in the blink of an eye, 5 days later, in the previous two days, the main road in the village leading to the old house of Li Yang's old house of several hundred meters has been fully paved.
Next, it is necessary to wait for a maintenance period of ten days to be able to communicate with the heavy trucks, so the subsequent projects will also wait for the road to pass vehicles before construction can be carried out.
However, Li Yang and the temporary workers he invited will not be idle in the next few days. In the next few days, they will also pour the dams of the fish pond.
The materials for pouring the fish pond embankment have already been stacked around the fish pond embankment.
In the past few days, Li Yang himself has not been idle. In addition to patrolling various places every day, he communicates with the designer who designed the house for him through prestige.
At the same time, Li Yang also learned a lot of precautions in building construction during this communication. If he understands building construction drawings and so on.
Because when building the house next, Li Yang himself has to act as a construction worker.
After all, the house he saw, although it looked like a courtyard on the surface, had a large basement inside.
And this basement will continue to expand in the future.
Therefore, in the early stage of building foundation construction, Li Yang had to make some preparations for the subsequent construction.
And this specific construction is Li Yang's own secret, so all the specific work, including construction, must be Li Yang's dead man.
Since none of Li Yang's current dead has the ability to build construction, he has to rely on himself for the time being.
(End of this chapter)
You'll Also Like
-
Anime Crossover Chat: Daddy was called to the police by Yukino!
Chapter 1389 17 hours ago -
Thunderbolt: I Became the Human Emperor in the Bitter Realm
Chapter 193 17 hours ago -
A Single Person's Infinite Wonderful Life
Chapter 580 17 hours ago -
I'm a teacher in Tokyo!
Chapter 205 17 hours ago -
Starry Sky Railway Travel Agency, popularizing Destiny in Genshin Impact.
Chapter 1215 17 hours ago -
One Piece: Starting with the Reanimation of Madara
Chapter 292 17 hours ago -
Super God: My creation of a Foundation universe has been exposed.
Chapter 184 17 hours ago -
Hong Kong film: The Ni family tycoon, who kills people and then amasses an army.
Chapter 403 17 hours ago -
One Piece: World Conquest Begins with Creating a Little Empress
Chapter 301 17 hours ago -
Crossover Anime: Starting with a Life Index, Join the Chat Group
Chapter 141 17 hours ago