I collect gold fingers in the heavens

Chapter 904 Waste electricity problem

When the high-level officials were still wondering whether Wu Siyuan was a hidden "witch", Wu Siyuan was going to the Tengger Desert in Xinjiang Province to inspect new projects.

[Chaoqun Group] once invested tens of billions of funds to carry out three-dimensional development in the Tengger Desert, providing energy from the photovoltaic industrial park, to the desalination water plant to provide water resources, and the supporting oil melon biological layoff industrial park to provide economic Benefits, with cattle and sheep breeding and supporting related industries.

Today's Tengger Desert has achieved sustainable circular development, truly has the ability to self-generate blood, provides nearly [-] jobs, and has established dozens of pocket towns throughout the desert, as well as a larger number of characteristic administrations. The village has driven significant economic development, from a place that needs to invest a lot of money every year to maintain it into a new oasis with an annual output of at least billions, and has become a model for desert control.

Every year, many important leaders and distinguished foreign guests come to inspect and deliver important speeches.

However, these situations are not the focus of Wu Siyuan's attention.

Wu Siyuan is concerned about photovoltaic industry projects.

After the success of the Tengger Desert project, many desert areas began to follow suit, wanting to replicate the success of the Tengger Desert, and introduced many photovoltaic industrial parks.

In addition, Wu Siyuan obtained the more efficient photovoltaic power generation technology from the [Martian] project - [Super Group] did not directly enter the photovoltaic industry, but only provided key components to domestic photovoltaic companies, which has already made these photovoltaic companies In global trade, other countries have been killed.

The advantage was already great, but now it is even more overwhelming.

This trillion-level photovoltaic industry does not mean that a large piece of cake has been eaten by the country, but that the entire cake will be taken away by the country.
But [Super Group] just issued a restriction order, and any photovoltaic company that transfers its production capacity to other countries will not be able to receive key parts and technical support from [Super Group].

In an instant, all domestic photovoltaic companies ceased fire
So the bald eagle finally found out that the clown turned out to be me, and the increased tariffs were transferred to my own family.

In the photovoltaic industry, [Chaoqun Group] is the real king!
A restraining order will allow the photovoltaic industry across the country to act in unison.

This influence is really nothing to say.

But having said that, [Chaoqun Group] really controls a lot of industries, no wonder so many people are worried about it.

Of course, this is not the point.

The point is that the domestic photovoltaic industry has not only been bloodshed abroad, but also in China.

The same is true for photovoltaic industrial parks.

Photovoltaic industrial parks with huge investments have sprung up all over the place.

After [Chaoqun Group] announced the [Magnetic Resonance Wireless Charging Technology], although [Chaoqun Group] repeatedly stated that this technology is not yet mature, it still triggered a wave of investment in photovoltaic industrial parks by many people in China.

Because once [Super Group]'s [Magnetic Resonance Wireless Charging Technology] is mature and ready for commercial use, the photovoltaic industrial park will become as valuable as an oil well.

Perhaps in this comprehensive [oil-to-electricity] transformation, they will not be able to eat the sweetest piece of cake, but there is no problem getting a share of it.

However, all of this is based on the mature implementation of the [Magnetic Resonance Wireless Charging Technology] of [Super Group].

However, there was a problem with the research.

This technology was actually obtained by Wu Siyuan from the world of [Doraemon Cloud Country], and the technology is very mature.

But the application scenario of this technology is on the cloud continent in the sky.

The sky is unobstructed, and the cloud continent can drift around the world.

Therefore, there is no problem with [Magnetic Resonance Wireless Charging Technology], and it can smoothly supply energy to all the cloud continents in the sky.

But when Wu Siyuan brought this technology into reality, the situation was different.

Due to technical limitations, Wu Siyuan was unable to apply this technology in the sky, and could only build those base stations on the ground.

Due to the influence of various factors such as terrain and safety, the situation has become very complicated.

It's not a problem in plains.

In mountainous areas, [magnetic field resonance wireless charging technology] is not very effective.

Of course, the application problem in most cities is still not big.

It is mainly a question of [electricity transportation].

After all, one of the most important points of this technology is to replace UHV wires and transmit electricity generated by new energy sources in remote areas at ultra-low cost.

It happened that there was a problem in this aspect, which caused this technology to be launched by [Chaoqun Group] for a long time, but it has been unable to be commercialized for a long time.

Of course, there are other reasons.

But this reason is the most critical.

Fortunately.

This problem was solved after Wu Siyuan went to the [Tianmo Shentan] world.

Wu Siyuan's subordinates got inspiration from the unique energy stone structure in the world of [Tianmo Shentan], and finally developed this energy storage battery with excellent effects.

It has two main functions.

The first function is to assume the role of a transfer base point in places where [magnetic field resonance wireless charging technology] is not well used, such as mountains, rivers and other places that are greatly affected by terrain, so as to transport electricity out.

The second function is to make new energy waste electricity, which is rejected by the power grid, really have a place for it to be used.

Why is the State Grid unwilling to use new energy sources such as photovoltaic power?

Because photovoltaic power is originally direct current, and the power frequency of the national grid is a standard 50 Hz alternating current, so photovoltaic power must be converted from low-voltage direct current to 50 Hz high-voltage alternating current through an inverter to meet the grid requirements.

Due to the uneven quality of inverters used in various places, it is difficult to ensure that the frequency sent to the grid reaches 50 Hz.The power grid is a sine wave of 50 Hz. Photovoltaic power that is not 50 Hz can only be regarded as harmonic power, which is what some people call "garbage power".

Different frequencies cannot be added directly, and the power is reduced.

In addition, the low rotational inertia of new energy power generation itself leads to poor adjustability, so the new power system will be more fragile, which in turn makes it difficult to secure and stable power supply of the power system.

This is the plight of new energy power, which is not welcomed by the grid.

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like