During the research and development of guns, the buildings of the staff community and elementary school that Xia Lin was thinking about were all completed, and he could start to implement the new district development plan and education plan immediately.

In order to carry out the project quality acceptance, Xia Lin had to hold an artillery seminar for Master Fine and the technicians of the gun factory. After explaining the main technical difficulties that might be encountered and how to deal with them, he rushed to the project.

When they came to the construction site where the construction waste had not been cleaned up, Xia Lin and Sharp, who valued the quality of the project, and the two captains led a group of small captains to inspect the project quality of the officially completed employee community and primary school.

While visiting the acceptance inspection, Xia Lin was thinking about whether to ask Her Royal Highness for a famous brand such as "Xinglan Primary School" to increase the foundation of the primary school.

The details of the three-story building and the two-story primary school building are in place. Xia Lin is quite satisfied after careful inspection, and told Sharp that they went to several other districts of Helgana to select sites and start construction of the primary school as soon as possible. Say more.

But then on the third floor of a staff building, after Xia Lin unplugged the water pipe in the toilet at the end of the corridor, he discovered a problem.

"Why is the water flow so small? Sharp, let two people go down to the first and second floors, and pull out the plugs there too. I'll see if the water pressure on the third floor is enough!"

Xia Lin looked at the weak water flow, frowned and told Sharp.

"Okay, boss! Captain Nova and Captain Ruen, you two go down and have a look!"

Sharp quickly called the two team leaders to go down to follow Xia Lin's instructions. Soon, as the plugs on the first and second floors were pulled out, the water flow on the third floor changed from weak to a thin line in an instant.

"This……"

Looking at this scene, Xia Lin felt a pain in his head. The water pump he designed was fine, and the finished product processed by the machine tool factory was also fine. The problem probably lies in the power of the pump.

If you want to pump the river water into the high water tower through the water pump, you must have a considerable speed to provide water pressure. Obviously, his hydraulic power has been unable to meet the power required for the normal operation of the pump, resulting in the water level in the water tower being insufficient to supply water to the third floor.

Power is the heart of industry, and only with a strong and powerful heart can there be a flourishing industry.

During this period of time, Xia Lin has encountered many problems due to insufficient power, but the steelmaking plant has just been established to solve the problems of the spine and skeleton, and the problem of the heart has to be considered, which really makes Xia Lin a little headache.

Even if the steam engine is processed with the precision and sealing technology of the current machine tool, it can only be said that the future can only be expected. Whether the thermal efficiency of the finished product can reach 1% is still a question, and it is not as high as the power provided by your own waterwheel.

Xia Lin thought for a while, what if this problem could be solved through magic?

After thinking about it for a while, he found that it was much more convenient and quicker to use the magic curve to overtake than to develop the steam engine, heat engine, steam turbine, internal combustion engine, and electric motor step by step.

As long as one can find a magic that can make the shaft rotate, and engrave this magic on the magic copper metal rod to make a rune stick, it is the most primitive magic machine.

Converting the magic power directly into the mechanical energy output of the shaft body is more advantageous than any power machine, so the problem comes to Xia Lin's magic research.

According to Xia Lin's vision, the spell he just named Spinning should be composed of kinetic energy runes and template runes.

Among them, the template rune group can refer to the whirlwind technique of the second ring. After all, the purpose of these two spells is to make the target rotate.

Then the next step is to solve the rune connection, make the rotation technique work successfully, and then engrave it on the magic copper metal rod.

At present, this is just an idea. If you write this idea down, Xia Lin can't solve the water supply pressure problem of the employee building for the time being, but he can ask someone to explain the situation to the employees who bought the third-floor house, and reduce or exempt some of the house purchase loans for them. .

In order not to have things like "the charterer has no water" at that time, Xia Lin also stipulated the water time of each floor in the morning and evening, and designed a batch of brass faucets for the machine tool factory to replace the original water faucets. Simple wooden stopper for water pipes.

After doing everything he could and confirming that there were no other problems with the two projects, Xia Lin was ready to sign the completion acceptance documents.

But after looking at the empty line in the column of Party A and thinking for a while, Xia Lin decided not to accept the engineering project in the name of the industrial park, but to set up a new district development company instead.

This new area development company, as the name suggests, is the main company responsible for the development plan of the new area. Xia Lin will put all the funds allocated by the commercial bank except for the construction of the employee community into the company's account books, and let them be responsible for their own operations.

The loan relationship for employees to buy houses in the established employee community will also be between the new district development company and the employees, not the industrial park and the employees.

The purpose of doing this is naturally to establish the subordinate name of the most important employees of the New Leaf Chamber of Commerce in the industrial park.

Although Xinglan Industrial Park is Xia Lin's industrial park, it is also the industrial park of Her Royal Highness and the Alliance. Xia Lin is only an executive director with management rights.

Through such a company that is controlled by the New Leaf Chamber of Commerce, rather than directly under the Xinglan Industrial Park, to manage the most important human resources, Xia Lin can guarantee the results of her own business.

After inquiring about the management of the construction company, the manager of the newly established new area development company was finally Simon Pitt.

He and Sharp also came from the literacy class of the industrial park. In addition, a construction team leader named Yang Lester signed up. Xia Lin naturally arranged them as the manager and deputy manager of the new company.

They were allowed to recruit a group of 20 company employees in the name of the industrial park. After signing the completion acceptance contract, Xia Lin soon had something for them to handle, which was to distribute the leaflets he printed to the industrial park. of regular employees.

On these leaflets, it is the completion of the construction of the employee community. The New Leaf Chamber of Commerce New District Development Company cooperates with commercial banks to issue housing loans. You can move into the employee community by returning 4 silver Mal.

The flyer also indicated that this community was established to support the development of slums, and all the profits earned would be invested in the construction of slum roads. As long as you are interested, you can go to the employee community to see the house after three days Information.

For this reason, Xia Lin specially trained Simon and Yang to learn how to introduce the advantages of the staff building they just built, such as the layout of three bedrooms, one living room and one kitchen, so that everyone can have their own room.

The thick bamboo-reinforced concrete walls no longer need to worry about being too cold in winter.The briquette stove in the small kitchen is convenient for cooking, and the fuel is easy to obtain. There are convenient automatic water faucets in the large toilet and large washroom at the end of the corridor, etc.

Compared with those mud huts in the slums, such tube buildings are definitely a blow to dimensionality reduction. Xia Lin is not worried that her employees will not be moved after seeing these facilities.

The only problem is whether the employees can understand and accept this installment payment method. This is the focus of Xia Lin's training for the two managers.

On the other side, in addition to distributing leaflets, Xia Lin also asked the factory directors of each factory to organize a group of managers to visit the employee community on the same day, while he himself was preparing for the opening of the first primary school in the slums.

On November 30, the directors of the six factories took [-] management personnel to the employee community where four buildings had already been erected in a cart arranged by the New District Development Company.

From a distance, you can see the four employee buildings whose outer walls are painted white with lime plaster. Although I have heard a lot about the employee community before, it is the first time I have witnessed the rare three-story building with my own eyes. These visitors were a little shocked.

"My God, this staff building is really tall and big! How many people can live in such a building!"

Edmund, who was the director of the brick factory, still had the original simple temperament, and exclaimed when he saw these "tall buildings".

"Six households on one floor, eighteen households on three floors, or eight or ninety people!"

He has a good relationship with Sharp, the general manager of the construction company, explained Roy, who knows more about the inside story.

"Hello, all factory managers!"

Yang had already waited at the gate of the community with the ten employees of the new district development company he had just recruited in charge of the housing loan business. As for Simon, he was still in charge of recruiting employees.

Seeing a group of people in the carriage, Yang immediately led his new subordinates to greet them hospitablely.

This group of factory directors and employees of the industrial park are their customers, and the first funds for the development plan of the new area are expected to be obtained from these fat sheep, so they can't help being unfriendly.

(End of this chapter)