1949 I am from the future
Chapter 413
Many people are powerful
"What did they say?! Want to watch us hang?!"
When Li Yangshan heard that these engineers and technicians refused to leave for life and death, and wanted to guard the generator set that they had installed by themselves, Li Yangshan's face stiffened because of anxiety.
"Huang Gong, aren't you messing around? Hurry up and take the engineers away? Huh?" Li Yangshan, who ran all the way along the gap between various building materials piled up on the edge of the main engine factory, tried to persuade him out of breath.
"Old Li, don't talk to me, the construction period is the military order, hurry up and hang me!"
"You! You!..." Li Yangshan had no choice but to obey when he saw that Huang Yang was determined and the construction period could not be delayed for a moment.
Li Yangshan, a graduate of the Department of Architecture of Nanjing Institute of Technology, personally climbed a tall stack of "Moso" bamboo boards, and ordered the hoisting commander standing beside him holding a small flag: "Start the hoisting!"
"But, Li Gong, Huang Gong and the others..."
"Leave them alone! Treat them as if they don't exist, be sure to be safe and make sure you don't miss them!" [
"Yes!"
With the small flag waving in the hands of the hoisting commander and the sharp whistle in his mouth, the crane operator on the tower crane began to hoist the capped steel beam.
Li Yangshan pinched the handle in his hand, and couldn't help saying: "Steady! Don't go too fast! Be more steady! Move slowly..."
Li Yangshan was relieved when he saw the construction workers on the scaffolding of the factory touching the steel beams with their hands.
As the steel girders were firmly fastened to the predetermined riveting and welding positions, cheers broke out on the site of the main engine workshop!
"It's capped! It's capped!"
"Yes! It's capped!"
The workers on the load-bearing wall immediately started riveting and electric welding, and the surrounding construction workers clapped vigorously, with joy and pride on everyone's face.
During the eight months of hard work, before the dormitory was built, they began to dig deep foundations, level roads, and arrange water pipes and ditches.And every day, they just sleep on the ground in the tent, the cold in winter and the mosquitoes and flies in summer, they don't mind.
After fighting in this field until this moment, they felt that all their hard work had paid off.
Huang Yang, an electrical engineer, felt relieved at the moment, looking up at the steel beams falling with his neck up.
He didn't care about "rubbing" "rubbing" his sore neck, and shouted at Li Yangshan: "Lao Li, tell the roofers to be careful, and don't drop anything! Hurry up! "
Amidst the cheers, Li Yangshan stood on the tall moso bamboo row, smiled and nodded from a distance.
Huang Yang smiled gratifiedly at Li Yangshan in the distance, and told the workers around him: "Don't remove the 'moso' bamboo protection frame on the main engine, and call me over after the roof is laid."
After finishing speaking, he said to the engineers and electricians around him: "Let's go! Go and see how the boiler and combustion tower are getting ready!" [
........................
Huang Yang worked until midnight before returning to the board room where they lived with the engineers.
Although this is just a simple board room, in their eyes, living and working here is more comfortable than being idle in the best apartment in the Republic of China.
When they first saw this kind of thing, all the engineers were very surprised. Seeing that this thing is like building blocks, it was built in one morning, which really surprised them.
That's not all, there is actually an air conditioner inside!This is something that only President Jiang and big consortium capitalists could afford in the past!What's even more outrageous is that there is a bathroom separated from the side of the long board room, and there is a flushing ceramic squatting device!
Next to the board house is a newly built shower room. The long shower room and the small boiler equipment on the side can provide 100 people with a shower at the same time. The water is directly pumped from the river not far from the thermal power plant and is very clear.
The air conditioner in the board room was turned on very low. As soon as the engineers came in, they immediately felt that the summer heat disappeared. The sultry summer night outside seemed to be isolated from them in an instant.
The central government sent them a mobile power generation car. Judging by the green appearance of the army, it must be used by the army to supply power to the wartime headquarters.The higher-ups instructed that the generator car burn oil and use it sparingly. In addition to lighting the construction site, another purpose is to provide electricity for the air conditioner in the board room where the engineer lives.
Huang Yang once wrote a report, proposing not to waste the money, but was rejected by his superiors.Because the central government is very detailed about the documents under the engineering headquarters, it has repeatedly been pointed out that no matter how hard it is, the electric power technicians cannot be hurt.The electrical engineers headed by Huang Yang were deeply moved by this.At the group meeting of the engineers, Huang Yang mentioned this matter again and again, warning everyone not to disappoint the expectations of the motherland!
On a row of double beds in the board room, seven or eight engineers who were too tired to speak and fell asleep as soon as they touched the bed boards in the air-conditioning.
Several canned fruits sent by the Ministry to supplement nutrition for technical backbones were placed on the simple wooden table in the center of the long board room dormitory. Huang Yang opened one with a can opener, and carefully picked up a piece of yellow peach with chopsticks and put it in his mouth. The delicate fragrance and refreshing sweetness hit the heart immediately, and the whole person relaxed.
Engineer Mi Shaoqing also sat on a stool and opened a can of yellow peaches, sighed while eating: "It's delicious, sweet, um, I don't know what brand it is, the labels on it are all torn off." The next time I asked what brand it was, I went back and bought it for my daughter-in-law."
Huang Yang also said while eating: "Well, this canned food costs at least RMB 25 on the market. The Ministry sends out one to our front-line electric engineering personnel every day, and here we have [-] per day. You know, Lao Li and his civil engineering director The Ministry, commanding tens of thousands of people, only distributes ten per day. The workers below only distribute one canned fruit a week!"
Mi Shaoqing said: "As long as I can go to the front line and participate in such an exciting project, I don't care about a few canned yellow peaches. In the past, during the Republic of China, I stayed in the office all day, guarding the Kuomintang Central Research Institute in Beikou, Tianjin It is a waste of life to maintain the 200-horsepower domestic unit.”
Huang Yang nodded: "Didn't everyone hang around under the KMT like this before?
But right now, the construction task of the Ministry is very heavy. Has the "Chairman" proposed a literature website yet?Such 20-kilowatt units will require 300 new installations across the country. "
Mi Shaoqing's jaw was about to drop: "300 sets? Five years? Oh my god, that's enough electricity for all the people in the whole country to light a big light bulb!"
Huang Yang swallowed the yellow peach in his mouth, and said longingly to Mi Shaoqing: "Yes, so by that time, everyone will be able to use electrical appliances, and there will be no need to pull electricity in the city anymore. Common people have all kinds of appliances in their homes. Electrical appliances, radios, televisions, refrigerators, and washing machines used by foreigners can be used by ordinary people. The lights in various factories in the country are turned on all night, and the production lines are running continuously without stopping for 24 hours."
Mi Shaoqing said: "Isn't this the industrialization that the country is talking about now! Huang Gong, we must make up for the country's century-old gap in our own hands!"
Huang Yang smiled, drank the sugar water in the can, and said happily: "After the commissioning of this unit is completed, as long as it goes well, the second and third phases of the project will be launched at the same time. The civil engineering has basically completed the second and third phases. With the experience of the first phase of the project, I estimate that if the second and third phases are installed at the same time, it will only take three months to complete! After the completion, I will go to the next project."
Mi Shaoqing also drank the sugar water in the can, looked at the brightly lit construction site outside the glass of the board room, and the workers who were still working overnight on the huge and towering giant chimney like a mountain bag, and said with emotion: "Wait until the work here is finished!" , I also want to apply for the next project.”
Huang Yang climbed onto his bed, lay down and closed his eyes, and finally said tiredly: "Go to sleep, you will definitely be indispensable."
........................
When Xiaoqiang heard Vice Premier Chen Yun say that 3000 people were mobilized for construction, he was dumbfounded for a long time. He said that I had read historical data and knew that when the Great Hall of the People was being built, 4000 people were working on the construction site every day. The number of construction workers gathered every day reached a crazy [-].
You know, it took 7 years to build the United Nations Building, and 8 years to build the Palais des Nations in Switzerland. The construction volume of these projects is similar to that of the Great Hall of the People. As a result, it only took 10 months to complete the Great Hall of the People!A satellite has been greatly released in the construction engineering industry all over the world!Shocked the world.
The engineering miracles of the soil turtles in this period really correspond to the saying that more people are more powerful.I'm a big turtle and mighty!
And a thermal power station actually employs 3000 people!
"Vice Premier Chen, where do the 3000 people sleep?"
Vice-Premier Chen said: "We set up tents and prefabricated houses. It was bitter when the weather was cold, but now that the weather is warmer, many workers directly use the straw mats issued by the engineering department to sleep in the open air.
The electric power project is directly related to the country's transportation, and it is matched with the industrial construction. It is related to whether the various factories we are currently preparing can be put into production after completion. All power plant projects planned in the First Five-Year Plan were completed on time!
However, the amount of supporting construction projects is also huge.So Xiaoqiang, in your next purchase, the power supporting facilities will be the big head.All kinds of power transmission and transformation equipment, power station pipelines, etc., we currently produce in France in large quantities and need to import them. "
Xiaoqiang readily agreed: "It's not a problem, these are civilian equipment, as long as you pay, you can have as much as you want."
After the four of them chatted for a while, seeing Vice Premier Chen handing over the official document to the "Chairman" and discussing the documents approved by the "Chairman", Xiaoqiang and Boss Chen got up and left.
When the "Chairman" and Vice Premier Chen were discussing vigorously on a document, there was a shrill cry from outside, "People are being beaten~~~! The People's Liberation Army is beating people!"
The "chairman" frowned suddenly.
"What's going on! Zhongnanhai, how did this happen!"
Li Yinqiao, the chief guard of the "Chairman", was also shocked, and rushed out of the courtyard gate of Fengze Garden with one stride.
--------
Sincere thanks to Shuibutou, hz880210 reward!
Ask for favorites and subscriptions.
〖∷Update fast∷∷Plain text∷〗
"What did they say?! Want to watch us hang?!"
When Li Yangshan heard that these engineers and technicians refused to leave for life and death, and wanted to guard the generator set that they had installed by themselves, Li Yangshan's face stiffened because of anxiety.
"Huang Gong, aren't you messing around? Hurry up and take the engineers away? Huh?" Li Yangshan, who ran all the way along the gap between various building materials piled up on the edge of the main engine factory, tried to persuade him out of breath.
"Old Li, don't talk to me, the construction period is the military order, hurry up and hang me!"
"You! You!..." Li Yangshan had no choice but to obey when he saw that Huang Yang was determined and the construction period could not be delayed for a moment.
Li Yangshan, a graduate of the Department of Architecture of Nanjing Institute of Technology, personally climbed a tall stack of "Moso" bamboo boards, and ordered the hoisting commander standing beside him holding a small flag: "Start the hoisting!"
"But, Li Gong, Huang Gong and the others..."
"Leave them alone! Treat them as if they don't exist, be sure to be safe and make sure you don't miss them!" [
"Yes!"
With the small flag waving in the hands of the hoisting commander and the sharp whistle in his mouth, the crane operator on the tower crane began to hoist the capped steel beam.
Li Yangshan pinched the handle in his hand, and couldn't help saying: "Steady! Don't go too fast! Be more steady! Move slowly..."
Li Yangshan was relieved when he saw the construction workers on the scaffolding of the factory touching the steel beams with their hands.
As the steel girders were firmly fastened to the predetermined riveting and welding positions, cheers broke out on the site of the main engine workshop!
"It's capped! It's capped!"
"Yes! It's capped!"
The workers on the load-bearing wall immediately started riveting and electric welding, and the surrounding construction workers clapped vigorously, with joy and pride on everyone's face.
During the eight months of hard work, before the dormitory was built, they began to dig deep foundations, level roads, and arrange water pipes and ditches.And every day, they just sleep on the ground in the tent, the cold in winter and the mosquitoes and flies in summer, they don't mind.
After fighting in this field until this moment, they felt that all their hard work had paid off.
Huang Yang, an electrical engineer, felt relieved at the moment, looking up at the steel beams falling with his neck up.
He didn't care about "rubbing" "rubbing" his sore neck, and shouted at Li Yangshan: "Lao Li, tell the roofers to be careful, and don't drop anything! Hurry up! "
Amidst the cheers, Li Yangshan stood on the tall moso bamboo row, smiled and nodded from a distance.
Huang Yang smiled gratifiedly at Li Yangshan in the distance, and told the workers around him: "Don't remove the 'moso' bamboo protection frame on the main engine, and call me over after the roof is laid."
After finishing speaking, he said to the engineers and electricians around him: "Let's go! Go and see how the boiler and combustion tower are getting ready!" [
........................
Huang Yang worked until midnight before returning to the board room where they lived with the engineers.
Although this is just a simple board room, in their eyes, living and working here is more comfortable than being idle in the best apartment in the Republic of China.
When they first saw this kind of thing, all the engineers were very surprised. Seeing that this thing is like building blocks, it was built in one morning, which really surprised them.
That's not all, there is actually an air conditioner inside!This is something that only President Jiang and big consortium capitalists could afford in the past!What's even more outrageous is that there is a bathroom separated from the side of the long board room, and there is a flushing ceramic squatting device!
Next to the board house is a newly built shower room. The long shower room and the small boiler equipment on the side can provide 100 people with a shower at the same time. The water is directly pumped from the river not far from the thermal power plant and is very clear.
The air conditioner in the board room was turned on very low. As soon as the engineers came in, they immediately felt that the summer heat disappeared. The sultry summer night outside seemed to be isolated from them in an instant.
The central government sent them a mobile power generation car. Judging by the green appearance of the army, it must be used by the army to supply power to the wartime headquarters.The higher-ups instructed that the generator car burn oil and use it sparingly. In addition to lighting the construction site, another purpose is to provide electricity for the air conditioner in the board room where the engineer lives.
Huang Yang once wrote a report, proposing not to waste the money, but was rejected by his superiors.Because the central government is very detailed about the documents under the engineering headquarters, it has repeatedly been pointed out that no matter how hard it is, the electric power technicians cannot be hurt.The electrical engineers headed by Huang Yang were deeply moved by this.At the group meeting of the engineers, Huang Yang mentioned this matter again and again, warning everyone not to disappoint the expectations of the motherland!
On a row of double beds in the board room, seven or eight engineers who were too tired to speak and fell asleep as soon as they touched the bed boards in the air-conditioning.
Several canned fruits sent by the Ministry to supplement nutrition for technical backbones were placed on the simple wooden table in the center of the long board room dormitory. Huang Yang opened one with a can opener, and carefully picked up a piece of yellow peach with chopsticks and put it in his mouth. The delicate fragrance and refreshing sweetness hit the heart immediately, and the whole person relaxed.
Engineer Mi Shaoqing also sat on a stool and opened a can of yellow peaches, sighed while eating: "It's delicious, sweet, um, I don't know what brand it is, the labels on it are all torn off." The next time I asked what brand it was, I went back and bought it for my daughter-in-law."
Huang Yang also said while eating: "Well, this canned food costs at least RMB 25 on the market. The Ministry sends out one to our front-line electric engineering personnel every day, and here we have [-] per day. You know, Lao Li and his civil engineering director The Ministry, commanding tens of thousands of people, only distributes ten per day. The workers below only distribute one canned fruit a week!"
Mi Shaoqing said: "As long as I can go to the front line and participate in such an exciting project, I don't care about a few canned yellow peaches. In the past, during the Republic of China, I stayed in the office all day, guarding the Kuomintang Central Research Institute in Beikou, Tianjin It is a waste of life to maintain the 200-horsepower domestic unit.”
Huang Yang nodded: "Didn't everyone hang around under the KMT like this before?
But right now, the construction task of the Ministry is very heavy. Has the "Chairman" proposed a literature website yet?Such 20-kilowatt units will require 300 new installations across the country. "
Mi Shaoqing's jaw was about to drop: "300 sets? Five years? Oh my god, that's enough electricity for all the people in the whole country to light a big light bulb!"
Huang Yang swallowed the yellow peach in his mouth, and said longingly to Mi Shaoqing: "Yes, so by that time, everyone will be able to use electrical appliances, and there will be no need to pull electricity in the city anymore. Common people have all kinds of appliances in their homes. Electrical appliances, radios, televisions, refrigerators, and washing machines used by foreigners can be used by ordinary people. The lights in various factories in the country are turned on all night, and the production lines are running continuously without stopping for 24 hours."
Mi Shaoqing said: "Isn't this the industrialization that the country is talking about now! Huang Gong, we must make up for the country's century-old gap in our own hands!"
Huang Yang smiled, drank the sugar water in the can, and said happily: "After the commissioning of this unit is completed, as long as it goes well, the second and third phases of the project will be launched at the same time. The civil engineering has basically completed the second and third phases. With the experience of the first phase of the project, I estimate that if the second and third phases are installed at the same time, it will only take three months to complete! After the completion, I will go to the next project."
Mi Shaoqing also drank the sugar water in the can, looked at the brightly lit construction site outside the glass of the board room, and the workers who were still working overnight on the huge and towering giant chimney like a mountain bag, and said with emotion: "Wait until the work here is finished!" , I also want to apply for the next project.”
Huang Yang climbed onto his bed, lay down and closed his eyes, and finally said tiredly: "Go to sleep, you will definitely be indispensable."
........................
When Xiaoqiang heard Vice Premier Chen Yun say that 3000 people were mobilized for construction, he was dumbfounded for a long time. He said that I had read historical data and knew that when the Great Hall of the People was being built, 4000 people were working on the construction site every day. The number of construction workers gathered every day reached a crazy [-].
You know, it took 7 years to build the United Nations Building, and 8 years to build the Palais des Nations in Switzerland. The construction volume of these projects is similar to that of the Great Hall of the People. As a result, it only took 10 months to complete the Great Hall of the People!A satellite has been greatly released in the construction engineering industry all over the world!Shocked the world.
The engineering miracles of the soil turtles in this period really correspond to the saying that more people are more powerful.I'm a big turtle and mighty!
And a thermal power station actually employs 3000 people!
"Vice Premier Chen, where do the 3000 people sleep?"
Vice-Premier Chen said: "We set up tents and prefabricated houses. It was bitter when the weather was cold, but now that the weather is warmer, many workers directly use the straw mats issued by the engineering department to sleep in the open air.
The electric power project is directly related to the country's transportation, and it is matched with the industrial construction. It is related to whether the various factories we are currently preparing can be put into production after completion. All power plant projects planned in the First Five-Year Plan were completed on time!
However, the amount of supporting construction projects is also huge.So Xiaoqiang, in your next purchase, the power supporting facilities will be the big head.All kinds of power transmission and transformation equipment, power station pipelines, etc., we currently produce in France in large quantities and need to import them. "
Xiaoqiang readily agreed: "It's not a problem, these are civilian equipment, as long as you pay, you can have as much as you want."
After the four of them chatted for a while, seeing Vice Premier Chen handing over the official document to the "Chairman" and discussing the documents approved by the "Chairman", Xiaoqiang and Boss Chen got up and left.
When the "Chairman" and Vice Premier Chen were discussing vigorously on a document, there was a shrill cry from outside, "People are being beaten~~~! The People's Liberation Army is beating people!"
The "chairman" frowned suddenly.
"What's going on! Zhongnanhai, how did this happen!"
Li Yinqiao, the chief guard of the "Chairman", was also shocked, and rushed out of the courtyard gate of Fengze Garden with one stride.
--------
Sincere thanks to Shuibutou, hz880210 reward!
Ask for favorites and subscriptions.
〖∷Update fast∷∷Plain text∷〗
You'll Also Like
-
Wan Jian returns to his clan!
Chapter 125 1 hours ago -
Those who face the wall, but are in the Nascent Soul stage.
Chapter 155 1 hours ago -
This villain is too popular.
Chapter 42 1 hours ago -
I manifested the Shushan game
Chapter 54 1 hours ago -
The most melodramatic rebirth in history
Chapter 507 1 hours ago -
Fear of food
Chapter 31 1 hours ago -
Real teaching, but diary flow
Chapter 121 1 days ago -
I teach in Naruto, and the system says I am Tsunade's student
Chapter 114 1 days ago -
Two Worlds, Starting with Kaguya of Penglai Mountain
Chapter 141 1 days ago -
Umamusume's days are numbered
Chapter 170 1 days ago