Ants exploded, I opened a power plant to supply power to the world
Chapter 38 038 The ultra-long high-voltage line has been completed!
Chapter 38 038 The ultra-long high-voltage line has been completed!
After two days, Lin Zhe personally traveled around Lincheng several times and finally determined the locations of three charging stations.
The charging station in the city center is the smallest. After all, the land here is quite expensive both in terms of rent and sale. There are only ten charging piles in total.
The location is on the road next to Lincheng Hotel.
As the earliest and best hotel in Lincheng, the road next to Lincheng Hotel is very wide and originally had roadside parking spaces.
Lin Zhe plans to take out ten of them and place charging piles next to them.
Another area is the open space near the Lincheng entrance and exit of the Chengxi Expressway, where Lin Zhe plans to directly pave the ground and then set up the first batch of 60 charging piles.
Anyway, there is a large area of wasteland here, and after negotiating with the authorities, we can start construction at almost zero rent.
The last point is the office center in the west of the city, where all the official units of Lincheng, large and small, are basically concentrated. There are still about 30 charging piles planned on the roadside.
This makes a total of exactly one hundred charging stations.
Lin Zhe has also learned about charging piles. The cheap ones can be purchased for several thousand yuan, while the more expensive ones can cost tens of thousands or even hundreds of thousands of yuan.
Currently, funds are still limited, and Lin Zhe would not even consider a few tens of thousands of dollars. In the end, he decided to purchase 100 pieces from a factory in the south that specializes in this. The price is thirteen thousand.
The price is decent, but the quality is good.
After deciding on the location, Lin Zhe then contacted the dealers and left the approval procedures to them.
But before this happened, Lin Zhe made a special trip to the Industrial and Commercial Bureau.
Because opening a charging station involves other company categories, you have to register a new one.
But later Lin Zhe thought about it and decided to simply upgrade the registration of Zhetong Electric Power to Zhetong Electric Power Group.
In this way, if there is a need to involve other industries in the future, you can just register them directly under the name of the group, which is also convenient.
Moreover, compared with Zhetong Electric Power Company, the name Zhetong Electric Power Group is obviously better-sounding and more "impressive" when it is said out.
This is easy if the employees below do the work.
In just over a week, the sign of Zhetong Electric Power Company was removed and replaced by Zhetong Electric Power Group.
……
Time flies and it is the end of the month again. Lin Zhe also received this month's business report.
This month, Zhetong Power supplied a total of 4.62 million kWh of electricity and generated electricity revenue of 2.72 million.
This number is quite satisfactory, but Lin Zhe feels that it is still not enough. He has to wait until he takes over the market in the county town. He has to speed up the progress.
Two days later, the charging piles were delivered by the manufacturer.
A yellow pickup truck with the words "Zhetong Electric Power" printed on it also arrived at the county town. The area to the west of the city is larger and the ground needs to be paved, so it cannot be installed for the time being.
However, charging piles can be installed first in the city center and the east of the city, and then they can be powered on and used after the power lines are delivered.
……
The taxi driver who ate instant noodles at Lin Zhe’s supermarket last time picked up a job from the bus station to go to Lincheng Hotel.
The road from the bus station to the hotel is a strictly controlled street and is very smooth.
Moreover, the hotel has a lot of customers, so once the food is delivered to the customer, the customer can place the next order immediately.
So the driver was still somewhat happy, and he took the customers to Lincheng Hotel while humming a little tune.
After he arrived, he noticed two yellow power supply trucks parked on the side of the road after driving a few steps, with a dozen people in neat work clothes busying around.
"Zhetong Electric? Is this a charging station? It's much bigger than the one I have at home, and it's like the fuel gauge box at a gas station." Without rushing to pick up the next customer, the driver pulled over, turned off the engine, and simply walked over.
"Master, are you installing charging stations? Are these public ones or private ones like hotels?"
After hearing this, several young men from Zhetong Electric Power who were working responded to him while working.
"This is from our Zhetong Electric Power Company. Once the power is connected, you new energy vehicle owners will be able to use it."
"Yes, there are not enough here, so we will install ten. There are two more locations in the west and east of the city with larger quantities."
After hearing what the electricians said, the driver also showed an excited look.
Now, these new energy taxi drivers finally have hope. With such a large charging station, the charging efficiency must be much faster than before, right?
Moreover, they are available here and in the west and east of the city, so they can charge anytime and anywhere, which is so convenient.
"By the way, how is this charged? Do I need to apply for an electricity card like a gas card?"
"No, you pay as you go. But if your family uses our Zhetong Power Supply, there will be discounts. You can see the details when you scan the code to charge."
After listening to the explanation of several electricians, the driver got on the car with excitement.
As soon as I get in the car, I open the driver group chat and send a voice note.
"Brothers, let me tell you something. I just saw a new power company called Zhetong Power installing charging piles. I heard that there are three locations with hundreds of fast-charging piles..."
This news also caused an uproar in the group chat.
After all, they have been looking forward to having a charging station in Lincheng for too long. Now it has finally come to pass, and everyone is saying that they want to be the first to charge when the charging station is powered on.
……
A week later, under the leadership of Engineer Wang, electricians from Zhetong Power and temporary workers completed the construction of the line from Shima Town to Lincheng County.
At the same time, the Zhetong Power Business Hall next to a bank in the county town was also renovated.
From the outside, you might think it's a bank if you're not paying attention.
This is also Lin Zhe’s requirement. The design and decoration should be on par with those of a bank, which also makes it look more upscale.
……
After the construction of this line was completed, Lin Zhe personally came to the salary distribution site.
The electricians of Zhetong Electric Power don't have to do that as their salary is deposited into their salary cards every month, but these temporary workers have to pay them back.
Several financial staff members settled the accounts in cash one by one according to each person's attendance sheet. In addition, Lin Zhe also asked his mother to clear out the rice, flour, grain and oil in his store.
These people are honest and hard-working people who work hard in the fields, and Lin Zhe also plans to give them some benefits.
Although there are not many things and they are not expensive, they can be regarded as a reflection of Zhetong Electric Power's humanistic care.
In addition to receiving a full salary, everyone also received a bag of rice or noodles, and a bucket of cooking oil, which are essential items for every household.
Looking at the happy smiles of these people, Lin Zhe also felt satisfied from the bottom of his heart.
I used a small amount of money to get everyone to work hard, and shortened the construction period by half.
Everyone also received “high wages” and small daily benefits, a win-win situation!
The next step is to move into the county town, and we still have to deal with Lincheng Electric Power, the local tyrant.
ps: I saw that many of the people who voted for monthly tickets and recommendation tickets were familiar IDs. Thank you all for your continued support, and to the book friends who follow the book. I am really happy to see these support. To the book friends who see this paragraph, I wish you all your wishes come true and something good happens in the future!
(End of this chapter)
You'll Also Like
-
All my hunting commissions come from another world?
Chapter 143 2 hours ago -
Siheyuan: A warm home with wife and children
Chapter 739 2 hours ago -
Zongman: All Heavens and Worlds Begin with the Devil's Curse
Chapter 158 2 hours ago -
Dual wielding volcanoes, killing through the west
Chapter 503 2 hours ago -
The sickly girl is killing her way through the weird world
Chapter 192 2 hours ago -
Stardew Valley of Gensokyo
Chapter 296 2 hours ago -
Hell Game: Starting from Metropolis
Chapter 914 2 hours ago -
Why was I assigned to be a horse girl?
Chapter 252 2 hours ago -
MyGO!!! I am the succubus Xiaoxiang?
Chapter 334 2 hours ago -
How come the Ace of Cups isn't considered the Holy Grail?
Chapter 174 2 hours ago