silent farm

Chapter 312 The Money-losing Business That I Did and Planned To Do

Chapter 312 The Money-losing Business That I Did and Planned To Do
After speaking with Fernando that day, Li Sheng adjusted the work of the farm, and finally managed to coordinate the work of the farm with the forced sales to the outside world.

Another month passed quietly.Silent Farm has become a bit of a misnomer.The farm was busy and noisy.

There are a total of twelve dredgers working day and night in the artificial river. It is said that the river has been dug to a depth of more than six meters, which is of course the water level in the wet season.Workers from Almerín have moved in, and work has begun on the embankment of the new pier.

The only people stationed on the platform are the elderly and children, and the rest are working in the silent farm.But the simple school can't accommodate so many children, at least there are hundreds of children playing on this platform.

The horsepower on the old pier was fully turned on, not only the cranes were loading and unloading goods non-stop, but there were more than two hundred conveyor belts in the upstream and downstream of the pier, loading things to the ships docked by the river.The roar of machines, the shouts of workers, and the sound of cows preparing to ship.

On the grassland that has been divided into small areas, there are also a large number of harvesters and balers working, and there are also a large number of trailers to transport the baled dry pasture.And several hardened roads planned to be built have also started construction.

Even the people in the management area of ​​the farm walked a little faster than before.The leisurely life Li Sheng imagined before did not appear.At this time, he even felt that the farm was as busy as a courier company receiving and delivering goods.

The rainy season is coming to an end, and once a week it rains is not bad.So now the farm has entered the peak of construction.Not only infrastructure, but other projects have also started.

Today's terminal is particularly busy because some equipment has arrived today.

It was one of the beverage packaging lines that Jose asked to buy.Although the farm has purchased some large-scale equipment before, it is the first time that such a large equipment has been purchased.

Li Sheng was a little worried about loading and unloading this thing.It is said that the heaviest part shipped this time weighed [-] tons.That is close to the hoisting limit of the crane.Moreover, the crane operator has no experience in hoisting such things.For the sake of safety, Thomas had to propose to rush outside and ask two experienced crane drivers to come back.

Wearing a hard hat, Li Sheng watched from a distance as the crane hoisted the parts of the equipment out of the boat and slowly moved them back to the shore.

It wasn't that he deliberately avoided it. In fact, because he was worried that the crane could not bear the weight and collapsed, there was only one ground dispatcher and a heavy truck parked under the tram within a radius of more than 30 meters around the crane.

A crane is required to lift that part onto the truck.

I have to say that an old driver is an old driver.One was commanding on the ground, and the other was operating the crane. They cooperated quite tacitly, and the part was quickly and accurately dropped onto the truck.But that's not the end.The crane still needs to bear a certain weight, because some fine-tuning needs to be done on the truck to ensure that this part is fixed on the truck and will not move during transportation.

This is not the most difficult part, the most difficult thing is that after the thing is transported to the destination, it has to be unloaded from the car and installed.

In order to complete this work, the farm also specially rented two cranes.That thing requires the cooperation of two cranes to complete the unloading.

Li Sheng watched the things being fixed on the car, and couldn't help applauding like everyone else.

He turned back to Thomas who had been standing by his side and said, "There will be a more sophisticated ship coming tomorrow. It is best for these two crane operators to stay."

Thomas also knew that three wind turbines would arrive tomorrow.Not heavy, but too expensive for something more sophisticated.It does take highly skilled personnel to keep it safe.

The unloading of this machine today is actually just a trial run by the two crane operators.

Thomas nodded, "I see."

The next day, in the early hours of the morning, three boats arrived at the dock at Silent Farm, and it took four hours to unload one of them.But this ship also has a very heavy thing, which is an engineering vehicle specially used to install the wind turbine column.The weight of this engineering vehicle is also more than 50 tons.And there are one or two on each boat.

These things loaded a fleet of heavy trucks.The things were transported to the center of the pasture, which is actually near those lakes.

In these places, there is already a high cement concrete platform on the ground, which is the base of the wind turbine built a few days ago.

There are five engineering vehicles in total, the largest one will be used as the fulcrum of the docked column, and the other four will be used as a pulling force to erect the column and install it on the base.

Li Sheng watched for more than an hour, only to find that the butt joint of the pillars had just been completed.It may take half a day to erect the pillars.He watched the large engineering vehicle slowly move the two-meter-diameter column at the base from one side to the roof, then backed the vehicle, and slowly tilted the base of the column downward after aligning itself with the position.Since the upper end of the column was lifted by another engineering vehicle, it was able to slowly move towards the base of the column, and the engineering vehicle supporting the upper end of the column slowly made the column too high.

The two engineering vehicles worked together to tilt the column to about sixty degrees.At this time, the largest project vehicle had reached the base of the column, and it slowly shifted its position, and the bottom of the vehicle covered the base.

At this time, a worker climbed up the column. Although there was a certain angle, the end of the column was at least 40 meters high.Li Sheng watched him climb to the end and put on the seat belt before he breathed a sigh of relief, quietly dissipating the energy field that he released at any time.

I saw the worker hanging the two ends of a rope from above.The people below tied a steel cable to one end and pulled the other end to pull the steel cable up.

After the workers above get the steel cable, they tie the steel cable to the column.

After tying four steel cables in a row, the worker climbed down.Then, the five engineering vehicles worked together to vertically erect the column. The largest one slowly aligned the hole at the bottom of the column with the more than 70 arm-sized bolts left on the base below, and slowly lowered the column to the bottom. on the base.Then there are workers who will fix the columns with nuts.

This process actually took the whole day.I have to say that although this efficiency is very fast, it still makes Li Sheng not very satisfied.

He did not continue to watch the installation of the wind turbine the next day.That is to require two engineering vehicles to adjust the wind turbine to the top of the column with a height of more than 60 meters and install it.It took another half a day, and the next three wind blades had to be installed, which would probably take a whole day.

On the day when the wind blades were finally installed, he went to see them for a while, and he didn't have so much time to stare at them all the time.After looking at it for a while, he drove to the two small lakes in the south to have a look.

In the farm, there are many mutated silver arowanas in those two small lakes.Of course, there are quite a few oxbow lakes, but Lake No. 33 and Lake No. 34, which have a higher concentration of spatial lake water, have higher densities.

Two days ago, Luo Zheng told him that the aquaculture farm had been found.The farm is located in Baicheng in the south of China.There is a freshwater breeding area with a water surface area of ​​more than 500 mu, but it will take some time to build the farm they want.

It must be a prodigal act to build a farm specially for protamine raw materials.Because the price of a protamine is only more than 20 yuan.The national demand may not exceed [-] a year.Therefore, it is a luxury to make money by selling raw materials for drugs.

Originally, he wanted to raise ornamental fish and get some protamine raw materials by the way.It was only later that I discovered that although the silver arowana in South America is also an ornamental fish, it usually goes to aquariums.Private individuals rarely itch to silver arowana.

Later, he also thought about raising other fish.But after thinking about it, it was definitely still the mutated arowana here according to the original plan.

Of course, as long as the raw materials needed by Nam Kwong Pharmaceutical are sufficient, he doesn't care what kind of products the farm raises.

When he came to the giant algae collection point in Lake No. 33, Zhang Hanfu, who had graduated from aquaculture major, was already waiting for him there.

Although Zhang Hanfu graduated with a major in aquatic products, he has never practiced in Silent Farm, because the farm has no aquaculture project at all.Instead, he and another classmate were assigned by Li Sheng to be in charge of cultivating bacteria in the Xiangxi mud.

This time he was called by Li Sheng, mainly because he was a professional in aquaculture.No matter how obsolete his specialty was, he was also more professional than anyone else on the farm.

Li Sheng called him to come to the lake and said, "Xiao Zhang, I plan to raise some silver dragon fish, which are almost sexually mature, and some half-sized ones. I plan to send them to Huaxia in August. What do you have?" Method?"

Zhang Hanfu thought for a while and said: "Boss, I can only talk about my thoughts, but I don't know if it is really feasible. After all, I have never practiced farming silver arowana."

Of course Li Sheng knew this, he nodded and said, "Tell me about it."

"You can catch some silver dragonfish of suitable size, and then send them to oxbow lakes or other lakes for cage culture. The artificial control point of cage culture is larger than that of free-range culture, which can improve the survival rate. In addition, when fishing starts , can reduce the possibility of fish being injured. It is conducive to long-distance transportation to China."

Li Sheng nodded and said, "Very good. Then you make a plan. You will be responsible for this matter."

Zhang Hanfu hesitated for a moment and said, "Okay. But what about the work at Xiangxi Bacteria?"

Li Sheng said: "From now on, Xiaoshi will be in charge of that side. When the work here is completed, I plan to let you take charge of another breeding department."

"Breeding silver dragon fish?"

"No, it's a stone frog."

There was obvious hesitation on Zhang Hanfu's face. After hesitating for a while, he said, "Boss, I still prefer to work in the Xiangxi Bacteria Cultivation Workshop."

Li Sheng looked up at him, nodded and said, "Okay, after the work here is finished, you can go back to the bacteria cultivation workshop. I will let Xiaoshi be in charge of the new department."

Zhang Han and Fu Gang still felt a little regretful when they said that, worried that it would leave a bad impression on Li Sheng.But hearing what Li Sheng said, he felt relieved.

Li Sheng patted him on the shoulder and said, "Although the silver dragon fish is not a valuable thing, it is very important."

"Boss, don't worry, I will do my best."

Li Sheng nodded, and asked him what he wanted from the new job.Finally drove back to the office.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like