American Ranch

Chapter 428 Supporting Engineering Group in Yunshan District

Chapter 428 Supporting Engineering Group in Yunshan District
It was dark when we went back to the ranch.

Cohen and Moxi prepared a reception banquet for Kang Si, and also called Luo Zhi and Chen Mo's uncles together...

Kang Si is not only a highly educated person, but also a technical talent and an overall planning talent.The Valley Ranch Sewage Treatment Center was designed by Kang Si and supervised the construction.The sewage treatment center built by River Valley Animal Husbandry in St. Bernie was also designed by Cons...

He was called here to participate in the construction and design of the feed mill and the construction and design of Yunshan Sewage Treatment Center.He has been in the United States before, but he also participated in the early design work.

The welcome banquet is a barbecue party.

While eating barbecue and drinking beer, Chen Mo and Kang Si chatted about the feed factory: "The feed factory will be built according to the schedule, and the drying tower will be built first. The pasture sown now should be harvested for the first time in two months. The drying tower should be built as quickly as possible, but the quality must be guaranteed.”

"Boss, the current construction pressure is too great. Some of the breeding buildings of Hegu Animal Husbandry and Rich Farming Company will be constructed by assembly...Bright told me that they will build 1 breeding buildings within a month. In July, the breeding pigs and sheep will live in the breeding building. 10 buildings will be built in one month, all of which are 7-storey high-rise buildings. Can the construction quality and safety be guaranteed at such a fast speed?" Kangsi looked puzzled, In the United States, it takes two to three months to build a casual residence.

"Don't worry. It's just a 6-story breeding building..." Chen Mo shrugged: "One month is already a very slow time, and there must be no problem with the quality."

Cohen handed Cons a bottle of beer: "The title of infrastructure madman is not in vain. It's just the construction part, and there are no technical difficulties. After working here for a while, you should get used to the efficiency here..."

In China, as long as the money is enough, few workers are afraid of suffering.The construction of the warehouse area of ​​Yunshan Ranch, the opening of the plantation, all the work is progressing very quickly.

"Cohen, the work of Yunshan Feed and Yunshan Sewage Treatment Center is very important to me. The design must be perfect, even if it costs more... Especially the Sewage Treatment Center, you have to work tomorrow , get acquainted with the work here first, and then start working..."

Early the next morning, Ellie took Catherine, Britney and Mia out to play.Chen Mo rode an off-road motorcycle and drove Kang Si around, first going to the rich peasant company, where the land is being leveled.Bring Kang Si to meet Bai Xiaoou and Luo Chen.Then go to the site selection of the feed factory, the site selection of the feed factory is leveling the land...

Land leveling is also being done at the sewage treatment center.

A construction site is under construction, there are green leather houses for simple temporary living everywhere, and the subgrade project is leveling the road in sections... Some sections of the road have been paved with asphalt.

In the entire Yunshan District, more than 1000 construction workers have moved in.When the construction of the main road is completed, it is estimated that nearly [-] engineering personnel will enter Yunshan District to start the infrastructure construction madness mode.

In the office area of ​​Yunshan Sewage Treatment Center, there is a group of temporary green leather houses. Nestle Group, Hegu Animal Husbandry, Yunshan Ranch, as well as the city government and the environmental monitoring team sent by the central government all have representatives. Right here.

A project with an investment of 70 billion yuan is no small project.More importantly, the 70 billion project is only the construction of supporting facilities in Yunshan District...

The sewage treatment center will first build a group of biogas tanks, and 4 groups of biogas tanks will be built.

The total investment of the 4 biogas pools is 50 billion RMB, and each biogas pool covers an area of ​​2300 mu.The biogas digesters in the biogas digesters group cover an area of ​​about 10 mu.

The overall process includes: anaerobic reactor, sludge dehydration, biogas purification, desulfurization and dehumidification, emergency discharge of biogas, carbon emission reduction monitoring, software automatic control system, etc.

A group of biogas digesters is a main body, and a single main body can treat millions of tons of sewage or hundreds of thousands of sewage every day.Note that every day...

If the four biogas digesters can be operated at full capacity, the biogas output can meet the annual natural gas consumption and annual electricity consumption of the largest city in the South Island, and there will be a surplus.According to the current scale of breeding, this sewage treatment center alone can at least create an output value of 30 billion a year.This is the most conservative estimate...the profit is 20 billion.After all, shit doesn't cost money...

The government is promoting a green South Island, which will reduce the use of chemical fertilizers and completely ban the use of chemical fertilizers in some areas.There are still many places in the South Island that need to improve the soil, and there is a huge demand for organic fertilizers.Coconut City has already signed a purchase contract with Yunshan Sewage and Manure Treatment Center for 500 million tons of granular organic fertilizer, and the price per ton is 550 yuan.

Granular organic fertilizer, 550 yuan per ton is not expensive at all.The market price of granular organic fertilizer is basically 800 yuan per ton.

In addition to purchasing granular organic fertilizers, there are also natural mineral organic fertilizers, which cost 1350 yuan per ton.Coconut State purchased 1 million tons at a time to improve saline-alkali land.

Chen Mo's Yunshan Ranch also purchases all fertilizers from here.The price is slightly lower, and a huge contract has been signed...Powder organic fertilizer, 280 yuan per ton.Liquid organic fertilizer, 50 yuan per ton.Natural mineral organic fertilizer, 850 yuan per ton.Chen Mo can get these fertilizers at a lower price because Chen Mo provides a lot of cheap pasture feed... Yunshan Ranch will also promote the centralized work of sewage and manure.

Dirt and manure are worthless, but if they are in large quantities, they will be worth money after systematic treatment.

Yunshan Sewage Treatment Center is now a piece of fragrant steamed buns. The TBL Alliance wanted to take a stake, but they didn't let it go.Before the Nestle Group wanted to own 40.00% of the shares, Secretary Ye negotiated with the other party several times, and also suppressed the shareholding ratio... The current investment shareholding ratio is 30.00% for the Yunshan Ranch, and 20.00% for the Nestle Group. The municipal government holds 20.00% of the five shares, and Hegu Animal Husbandry holds [-]% of the shares.

In the future, the operation of the sewage and feces treatment center will be in charge of Hegu Animal Husbandry, and the major shareholders only have the right to supervise...

The 20.00% shares held by Hegu Animal Husbandry are not entirely exclusive to him. The operation of such a large processing center is not only difficult to construct, but also difficult to operate. Joining...Bright went back to the United States a few days ago, and is buying several large ranch waste cleaning companies with relevant experience and technology.

Nestle Group holds 20.00% of the five shares and is also providing technical support for this project.The profitability of this project is nothing to Nestle Group, but it can get a lot of technology from it.

The city government also invited the Academy of Agricultural Sciences, and many experts and professors participated.

What Chen Mo provided here was feed, before the dirty dung.Because they sell cheap feed, the farm has to sign a centralized treatment contract with Chen Mo... He also has technical talents, Kang Si.

There are many talents who understand large-scale sewage treatment, but not many people understand comprehensive development.Consi has presided over the design and construction of two such projects, and has served as the deputy chief engineer of Yunshan Sewage Treatment Center since he came here...

The Yunshan Feed Factory was invested by Chen Mo alone. The first thing to build was the drying tower group, and then the silage feed fermentation workshop.In order to facilitate transportation, the fermentation tank used for the fermentation of green storage materials was directly converted to a carriage design. In the future, it will be shipped directly to the farm together with the carriages. The initial investment is huge, but it is convenient and trouble-free in the later stage.

Also because the Yunshan Ranch has an additional 10,000+ mu of land, the feed factory has been expanded again, further increasing the budget.

(End of this chapter)

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like