The closure of a dam is an extremely critical and high-risk stage in water conservancy projects. This is because it is equivalent to completely blocking the water flow of the Lei River. The impact force of the water is quite strong, and the slightest carelessness in the closure process can lead to a huge accident.

Lin Chen was unaware that the bridge was being joined today, and the construction team hadn't updated the progress report yesterday. Normally, such critical milestones in a project require the approval of all three parties before they can proceed.

Fortunately, they made it in time today.

Everyone was quite surprised to hear Lin Chen suddenly shout "We can't merge!"

Apart from Ji Wanqing, the other experts' titles were basically obtained through connections. Some of them had never worked for decades and had never been to a water station, so they had no idea what a closure was.

Ji Wanqing also walked over quickly. As soon as her fingertips touched the cement dust on the surface of the steel bars, her brows furrowed tightly. She then bent down and touched the mortar on the ground. Her fingertips were damp with moisture. A trace of seriousness flashed across her eyes. She turned to look at Zhou Zhenxing, the project manager, with a silent question in her eyes.

Zhou Zhenxing also looked puzzled and came over to ask softly, "No, Expert Lin, is there a problem? The closure was scheduled for today a long time ago, and we can't afford to delay it."

Lin Chen took two steps forward, walked to the pile of steel bars, bent down and picked up a loose tie wire. His fingertips lightly ran over the uneven steel bars. He looked up at Zhou Zhenxing, his gaze calm but with an undeniable certainty.

"If I remember correctly, the spacing between the main reinforcement bars in the closure section is 20 centimeters, as indicated on the drawings. Here, it's less than 10 centimeters in some places and only 15 centimeters in others. Even if you have a 2-centimeter error, it shouldn't be this much different. What's going on?"

Zhou Zhenxing's face looked a little unnatural. He walked to the side and got a measuring tape from the construction workers. He measured two places, and the measurements were exactly the same as the numbers Lin Chen had given.

Zhou Zhenxing forced an explanation: "Expert Lin, are you mistaken? The design drawings say the spacing between the main reinforcement bars is 20 centimeters? I remember it being 15 centimeters. The flow of the Leijiang River is too strong. If the spacing between the reinforcement bars is too wide, the restraining effect of the concrete will be greatly weakened."

Lin Chen immediately and confidently replied, "I can't possibly be mistaken. You can find your design drawings. Moreover, as far as I know, a spacing of 20 centimeters between the main reinforcement bars is reasonable. If the spacing is too close, it is difficult to fully vibrate and compact the concrete, which can easily form voids and honeycomb, reduce the overall integrity and impermeability of the structure, and make it easy for water to seep through these weak points and crack under the pressure of floodwater during the flood season."

Zhou Zhenxing was about to send someone to look at the blueprints when Ji Wanqing stood up and said, "No need to look anymore. Lin Chen is right. The blueprints do say 20 centimeters."

Zhou Zhenxing nodded and continued to explain, "Okay, but overall, higher density is definitely guaranteed. We can use the method of manual compaction to eliminate the so-called gaps and honeycomb, which can be improved."

Supervisor Chen Jianchun also spoke up: "Yes, if it's just about the density of the steel bars, I don't think it's necessary to be so serious. I've already done the tests, and the density and strength are sufficient."

"Heh, I'll ignore the spacing for now." Lin Chen snorted and continued, "Look at your binding process. The closure section is a high-stress area. The company stipulates that a double cross binding method must be used, with each binding point twisted at least six times, and the exposed end of the wire must face downwards to prevent it from tearing the formwork. Look at your workers, they either use single binding or twist it two or three times and that's it, with all the exposed ends facing upwards. If concrete is poured, the steel bars will all loosen once the formwork is removed."

"More importantly," Lin Chen straightened up, his gaze sweeping across the room, his voice suddenly rising, "the drawings require a 5-centimeter thickness for the protective layer of the steel reinforcement in the closure section, but the spacers you are using now are only 3 centimeters thick. The protective layer is not thick enough, and the steel reinforcement will be directly exposed to the outside. It will rust within five years, and you can imagine what will happen to the structural strength of the dam then."

"Is the moisture content of the mortar also too high? I'm not an expert on that, but I haven't seen your waterproofing treatment. If the mortar has too much moisture and the water doesn't evaporate completely, the dam will definitely be riddled with holes within a few years. This is a vital project concerning the livelihoods of millions of people. If problems arise because of these oversights, none of you can bear the responsibility."

Lin Chen immediately pointed out three problems, each of which was insightful and convincing. The room fell silent instantly, as if everyone was impressed by Lin Chen's professionalism.

A mountain breeze blew by, ruffling the hem of Lin Chen's clothes. He stood amidst a pile of reinforced concrete, the sunlight shining on him, making him look like an immortal, so handsome that people dared not look directly at him.

Wu Xin and the other experts nodded in agreement, their eyes filled with shock and admiration as they looked at Lin Chen. They had always thought this kid from the county was a bit of a simpleton, but now they realized that he was truly capable.

As Ji Wanqing watched Lin Chen's figure, a rare admiration appeared in her eyes behind her glasses. Her chest tightened slightly, and a smile unconsciously curved her lips—it was pure appreciation.

Tan Aisheng's face turned ashen upon hearing Lin Chen's words. He had come today specifically to witness the completion of the bridge and take photos, having already reported to his superiors and written and sent out various reports. If the bridge failed to complete today, he would not only have made a wasted trip but would also be reprimanded by his superiors. So he stared at Zhou Zhenxing and asked coldly, "President Zhou, what exactly is going on?"

Zhou Zhenxing's face turned pale instantly, and sweat broke out on his forehead. He walked over hesitantly, his tone filled with urgency as he explained, "Minister Tan, firstly, this double-cross binding method is no longer necessary. It was only needed before because the mortar wasn't hard enough. Now, grouting can make up for it. As for the thickness of the protective layer, I'll have someone add it immediately. The mortar was damp this morning because of the high humidity; it will dry in the sun and won't delay the closure."

Upon hearing that this wouldn't delay the closure, Tan Aisheng's expression immediately brightened with excitement: "So we can still close the gap today? Are you sure?"

Zhou Zhenxing immediately pointed to the river not far away and pleaded, "Closing the dam today is inevitable. Look at the water level of the Lei River these past few days; it's the lowest since autumn. The flow has slowed, and the water level has dropped below the warning line. Moreover, today's weather is clear and windless. It's absolutely the best window of opportunity given by God. If we miss today, we'll have to wait at least half a month to a month for such a low water level again. According to the weather forecast, there seems to be heavy rainfall in a week. If we don't close the dam now, all our preliminary work may be wasted when the flood season arrives. Who can bear that responsibility?"

The supervising engineer, Chen Jianchun, quickly chimed in, his tone urgent: "Yes, experts, Minister Tan, we've not only been monitoring the construction progress, but we've also been keeping a close eye on the hydrological data every day. Today's water flow conditions and weather are practically tailor-made for the closure. Any minor deviations in the construction are insignificant compared to these excellent conditions. Moreover, we can gradually eliminate these trivial impacts later. The key is that we can't delay such a crucial closure period. We all know how tight the project schedule is. If we don't close the closure now, the project will be delayed by at least half a month."

Tan Aisheng seemed to be persuaded. He stood on one side of the dam and pretended to look around, saying, "The weather is indeed nice. If we can close the dam, let's do it first. We can deal with the other problems later."

"Damn it!" Lin Chen thought he had misheard. "You can do it like this?" He immediately retorted, "Minister Tan, right? If you don't understand the situation on site, don't give orders blindly. This will cause problems. If these issues aren't resolved now, closing the gap will be irresponsible to the project and to the people."

He knew that his outburst had not only offended Bi Jinghe but also offended Tan Aisheng. But he also knew that the Leijiang Water Station was a multi-billion yuan project for the people's livelihood and a project to save the lives of millions of people, and it could not tolerate the slightest carelessness.

Upon hearing that Lin Chen dared to disrespect Tan Aisheng, Bi Jinghe immediately jumped out and, pointing his finger at Lin Chen's nose, scolded, "Lin Chen, is this how you speak to Minister Tan? Don't you know what 'favorable timing and location' means? The key to closing the dam is to advance quickly while the water level is low. This kid just wants to show off his technical skills and deliberately cause trouble! Today's water level is a once-in-a-century event. If we miss this opportunity, we'll really lose big time. If we delay this window of opportunity for dam closure, you won't be able to bear the responsibility even with ten heads."

Lin Chen's gaze swept across the calm river surface before returning to Bi Jinghe's furious face. A mocking smile curled at the corner of his lips: "The low water level is an opportunity given by God, not an excuse for cutting corners. Bi Jinghe, do you know that the closure section is the heart of the dam? Irregular spacing of the steel bars will cause cracks in high-stress areas; if they are not properly tied, the steel bars will shift when the water pressure rises during the flood season; if the mortar has excessive moisture content, internal voids will turn the dam into a tofu-like mess. Are all these things so insignificant in your eyes? I'll put my words here: if you insist on closing the dam in the sloping section today, fine, whoever makes the decision will be responsible. I will take pictures of you as a souvenir. If the dam collapses in the future, I guarantee you will be the first to go to jail."

The moment these words were spoken, the scene fell silent. Tan Aisheng's face turned deathly pale, and even the roar of the machines seemed to weaken. Bi Jinghe pouted and still spoke forcefully: "Lin Chen, you jinx, if you can't speak properly, then shut up. This is not your place to make decisions."

Ji Wanqing also spoke coldly, his tone filled with unquestionable certainty: "Lin Chen is right, and I also agree that we cannot close the dam today. Any one of these three problems is enough to make the dam a dangerous building, especially the mortar with too high moisture content, which is an absolute taboo. Good water flow is an advantage, but quality is fundamental. We absolutely cannot close the dam today."

Tan Aisheng's face was ashen. He looked at the shallows where the river flowed slowly, then at the chaotic construction team in front of him. A hint of hesitation flashed in his eyes, but he finally glared at Zhou Zhenxing and asked sharply, "General Manager Zhou, Supervisor Chen, didn't you do data monitoring before this closure? Where is the data? Show it to me."

"We did the testing, but the data wasn't saved." Zhou Zhenxing and the supervisor panicked instantly, stammering for a long time before they could speak. They hadn't done a proper spot check that morning; it was just a formality.

Tan Aisheng immediately got angry: "Without data to support it, what kind of closure are you talking about? Right now, do some random checks and stress monitoring to see if the data meets the standards, otherwise don't bother with the closure today."

There was no other way, so the construction team immediately arranged for a stress test. Unsurprisingly, the data was far from sufficient and did not meet the standards for closure.

"Bullshit, you guys take your time. I'm going back. You guys keep a close eye on things. If the data isn't up to standard, don't let it be completed." Tan Aisheng glanced at the data and didn't want to deal with it anymore.

Bi Jinghe's face flushed red and then turned pale. His previous arrogance vanished completely. He clenched his fists so tightly that his nails dug into his palms. The jealousy and resentment in his heart were almost burning. This Lin Chen had stolen his thunder again!

Lin Chen watched the scene unfold before him, a cold smile playing on his lips.

He stepped forward, his gaze sharp as a knife, sweeping over everyone present: "Rework it! Completely rework it! Remove all the substandard steel bars and re-tie them, replace all the mortar, and make sure the moisture content meets the standards. We'll only discuss closing the gap when it meets the standards. Even if we miss this window of opportunity, we absolutely cannot gamble with human lives!"

Zhou Zhenxing still tried to argue: "Engineer Lin, rework will take at least seven days, and this construction period—"

"Which is more important, the construction period or the quality?" Lin Chen interrupted him, his voice as cold as ice: "Don't try to pressure me with the construction period. I don't care about the construction period. The construction period is just a leader's achievement, but it's bullshit when it comes to quality and the interests of the people."

Zhou Zhenxing had no choice but to shake his head: "Alright, I'll arrange for rework right away."

And so the matter was settled. Ji Wanqing and Lin Chen continued to walk around the construction site for inspection. The two walked side by side along the riverbank, with the rolling eastward-flowing river beneath their feet and the majestic dam in the distance.

Ji Wanqing stopped, staring directly at the river. After a long silence, she slowly spoke, her tone filled with complex emotions: "Lin Chen, you taught me a lesson today."

Lin Chen looked at the distant mountains and smiled faintly: "Expert Ji, you flatter me. Even without me, you could have seen these problems, couldn't you?"

"I should be able to tell." Ji Wanqing turned her head and looked at his profile, her eyes filled with an unprecedented seriousness. "But I might not have the courage to stand up and stop it. I have too many concerns: the face of the provincial company, Minister Tan's authority, the so-called construction period—but you are different. You seem to be afraid of nothing. Sometimes I really wonder where your courage comes from. You are just an employee of the county company."

Lin Chen turned to look at her, suddenly grinned, and said in a relaxed tone, "It was given to me by Fish Leong."

Ji Wanqing was stunned for a moment, then couldn't help but laugh out loud. Her eyes crinkled into crescents, like a spring breeze blowing across the river, instantly dispelling all the chill.

"You little rascal," she scolded playfully.

Lin Chen's smile vanished. He walked to a high slope, turned back to look at Ji Wanqing, and said in an extremely serious tone, "My courage comes from the millions of ordinary people. When you have witnessed the collapse of the dike and the flooding of villages, and seen those displaced people weeping bitterly, you will understand—people are more important than the sky, and the quality of engineering is of paramount importance."

Sunlight shone on him, and the mountain wind rustled, lifting the corners of his clothes.

At that moment, Lin Chen's figure, as upright as a pine tree and as resolute as steel, left an indelible mark on Ji Wanqing's heart.

A feeling she had never experienced before, like spring grass by the river, quietly sprouted and grew wildly in her heart.

>

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like