Having achieved financial freedom, I reorganized my workplace.

Chapter 135 The Leijiang River is Completed, Everyone is Happy

Chapter 134 The Leijiang River is Completed, Everyone is Happy

The Leijiang project must be put into operation by January 30th, which Lin Chen considered a pipe dream. It was impossible because even disregarding the hidden dangers and defects, there was still too much finishing work to be done.

But once the production date was finally set, the construction team seemed relieved.

Looking at the progress list sent by the construction team, Lin Chen couldn't help but doubt himself, wondering if his professional judgment had been completely wrong from the very beginning.

It's fucking amazing, it seems to actually work.

The last three days were chaotic and disorganized throughout the Leijiang project site.

The construction team mobilized more than fifty strong laborers from surrounding construction sites overnight to help. Incandescent lights illuminated the construction site as bright as day. The roar of the mixers and the shouts of the workers mingled together. The entire project was like a machine that had been forcibly injected with chicken blood, rushing forward like a madman.

It has to be said that the efficiency of those last three days was so high that it left Lin Chen speechless. It was no exaggeration to say that they did almost a month's worth of work in just three days.

Moreover, the construction team was surprisingly obedient. Lin Chen had talked about the issue of ground flatness hundreds of times, and the construction team brought in mortar overnight to level the ground.

Lin Chen had been arguing with the logistics department for a month about the insufficient brightness of the streetlights at the entrance, which affected the safety of nighttime construction. In less than ten minutes, new high-powered streetlights were installed, which were dazzlingly bright.

Lin Chen stood aside, watching the bustling scene before him, feeling a mix of emotions, constantly pondering the question: where exactly did the problem lie?

However, last night, Ji Wanqing was chatting with Lin Chen on the bed when she mentioned a crucial point: "Lin Chen, it's actually good to start production now. Only projects that are completed quickly can demonstrate your ability. If you're given three to five years to complete a project, then it's meaningless."

Lin Chen thought about this for a long time before he understood it.

indeed.

At Xinhai Water Company, projects must be completed "rushed" to the finish line. Without this chaotic sprint, the true value of a project cannot be demonstrated.

But even if we work our butts off for three days, what can we change?

The waters here are too deep, deep enough to drown all his professional convictions.

The Leijiang Project was ultimately put into operation for the sake of operation.

On the last night before production began, Lin Chen lay on his hard bed in the dormitory, tossing and turning, unable to sleep. He decided to call Tang Yuwei.

On the other end of the phone, Tang Yuwei's voice sounded tired. Lin Chen poured out the absurdities of the Leijiang project, and couldn't help but complain about Chairman Tang: "Yuwei, what is our Chairman Tang thinking? She clearly knows that this project has many hidden dangers, yet she still set a production date. It's unbelievable."

Yes, the final production process was confirmed by Chairman Tang.

Instead, Tang Yuwei explained to Lin Chen in a soft voice: "Lin Chen, this matter can't really be blamed on Chairman Tang. Many times, even he is powerless to change the timeline. The Leijiang project is not just a matter for Xinhai Group; it is a key project under supervision. The commissioning date is related to the water conservancy scheduling of three provinces, so the timeline set at the beginning cannot be changed at will. Therefore, he is actually very troubled, which is why so many experts were assigned to intervene in advance. He wants the project to be done solidly more than anyone else."

Well then, since even the chairman can't change anything, what can a mere expert from a small county company change?

On the morning of January 30th, as if the heavens were deliberately adding a touch of atmosphere to the commissioning ceremony, the banks of the Leijiang River were shrouded in an unusually thick fog. Water vapor rose from the river surface, creating a vast expanse of white, and the distant dam appeared and disappeared in the fog, like a floating pavilion in mid-air, a beauty almost unreal.

Lin Chen didn't arrive at the construction site early today, not because he overslept, but because he didn't want to come at all. However, it was his duty, and he had no other choice. He also didn't want others to reap the rewards of his efforts.

As he walked along, the scene before him seemed increasingly absurd: the once smoky and chaotic path beneath his feet was now covered with a brand-new red carpet, stretching from the parking lot all the way to the commissioning ceremony site at the top of the dam. The sides were filled with colorful flowers, with anthuriums, lilies, and carnations vying for attention. There were also banners along the way, with the golden characters "A Century-Old Project with People's Livelihood as its Foundation" and "Overcoming Difficulties to Create New Glory" standing out brightly in the mist.

Upon arrival at the site, the construction site was already bustling with activity. At the entrance, staff members in matching navy blue suits, wearing name tags that read "Leijiang Project Production Preparation Group," were all extremely busy.

Some people climbed ladders to build rainbow arches, and banners with red backgrounds and gold lettering were stretched straight, reading "Warmly celebrate the successful commissioning of the Leijiang Water Conservancy Project." Some people squatted on the ground to adjust the sound system, and the microphone occasionally emitted a harsh electrical sound. Others carefully watered the newly planted potted plants. Those pothos and anthuriums were brought from the city's greenhouses overnight. Their leaves were glossy and covered with crystal-clear water droplets. They were neatly arranged on the edge of the dam.

The construction workers were required to change into brand-new blue overalls, with shiny "Leijiang Project Builders" badges pinned to their chests. They lined up in several long rows according to their height, their faces showing the exhaustion of working through the night, their eyes filled with numb obedience, like a group of carefully dressed props waiting to be captured by the camera.

At 9:30 a.m., the thick fog gradually began to dissipate, and company leaders arrived one after another. Black cars lined up in a long queue in the temporary parking lot, arranged strictly according to their rank, clearly distinguishing themselves and exuding an inviolable sense of order.

Tang Mingde, the chairman of Xinhai Group, also arrived early. He was wearing a well-fitting dark gray suit, and his hair was combed so neatly that not a single dandruff could be seen. He was talking with an elderly man with gray hair and a vigorous spirit on the dam. That was Vice Minister Zhou from above, who came specifically for this production launch ceremony. It is said that he was the one who approved the Leijiang Project.

"Minister Zhou, look at this Leijiang Dam. Although we are rushing to meet the deadline, we have strictly followed national standards for every key structure. We dare not be ambiguous in the slightest." Tang Mingde's voice was steady and powerful, carrying confidence in the project and respect for his old leader.

Vice Minister Zhou gazed at the dam gradually becoming clearer in the distance, nodded slowly, and said with a sense of satisfaction: "Chairman Tang, the Leijiang Project is the key to water conservancy scheduling in the three provinces. When the project was first proposed, many people were worried that you would not be able to handle it, after all, the construction period was tight and the task was heavy. Now it seems that Xinhai Group has not let me down, nor has it let the people of the whole province down."

"You flatter me. This is what Xinhai Group should do." Tang Mingde bowed slightly, his gaze sweeping over the busy crowd not far away, finally settling on the central control room.

"Actually, the project was able to be put into production on time thanks to the front-line technical team and builders, especially our technical expert team. Since the project started, they have been working on the construction site and have overcome many technical difficulties. Without their dedication, the project quality could not have been laid such a good foundation."

Upon hearing this, Vice Minister Zhou followed his gaze and looked over with approval in his eyes: "It is a blessing for Xinhai to have such down-to-earth, hardworking, and highly skilled technical personnel at the grassroots level, and it is also a guarantee for the project. We must give a good commendation to this group of young people at the ceremony later."

Media reporters, carrying their cameras and microphones, crowded in the front row below the podium, all pointing their lenses at the leaders on the stage.

A young reporter who had just started out was probably looking for some different material. He was carrying his camera and trying to get closer to the control room when he was stopped by two men in black security uniforms as soon as he crossed the cordon: "Comrade, this is the core area. You can't get close. You can only take pictures in designated areas."

The young reporter, unwilling to give up, turned back, his gaze falling on Lin Chen behind the glass. His eyes lit up, and he immediately ran over, microphone in hand, and shouted through the glass, "Excuse me, are you the on-site technical lead? Could you tell us about the technical highlights of the Leijiang Project?"

Looking at the expectation and innocence in his eyes, Lin Chen felt a lump in his throat, and finally managed to utter only a few words: "Start production on time."

After saying that, he turned and left, leaving the young reporter standing there, microphone in his hand hanging in mid-air, looking extremely embarrassed.

At 11:00 AM sharp, the beautiful host from Xinhai Group walked to the front of the stage with a microphone, cleared her throat, and her voice, carried across the entire river by the sound system, was so passionate it was almost distorted: "Respected leaders, distinguished guests, dear builders, and friends from the media, good morning! Today, we gather in the beautiful Leijiang River to witness this historic moment! The Leijiang Water Conservancy Project, which took three years and eight months to complete and has a total investment of 5.6 billion yuan, is a truly vital project for the people's livelihood and a project that will last for a century! Its successful commissioning will completely solve the water problem for millions of people on both sides of the Leijiang River, effectively alleviate regional droughts and floods, promote the high-quality development of the riverside economic belt, and add a brilliant chapter to the province's water conservancy construction! Now, let us welcome our leaders to the stage with the warmest applause!"

Amidst thunderous applause, Vice Minister Zhou, Tang Mingde, Bi Chenggong, and other leaders at various levels walked onto the stage in turn and took their seats according to their assigned names. The host continued, "Next, let's give a warm round of applause to Mr. Tang Mingde, Chairman of Xinhai Group, for his speech."

Tang Mingde stood up, straightened the hem of his suit jacket, and walked to the microphone.

His gaze slowly swept across the crowd below the stage, finally settling on Lin Chen's direction, his eyes filled with obvious approval: "Respected Minister Zhou, distinguished leaders, and colleagues, today, being able to stand here with you all to witness the commissioning of the Leijiang Project fills me with immense excitement and pride. Since its commencement, the Leijiang Project has faced numerous challenges, including tight deadlines, high technical requirements, and complex geological conditions. However, we at Xinhai have not backed down. The frontline builders have worked day and night, and the technical team has overcome numerous difficulties, ultimately completing the construction task successfully."

He paused, raised his voice a few decibels, and said with great seriousness: "Here, I want to give special mention to our expert team. From the very beginning of the project, they have been working on the construction site. With their solid professional knowledge and serious work attitude, they have discovered and promoted the solution of a series of technical problems. Of course, among the expert team, Comrade Lin Chen is particularly outstanding. Without Comrade Lin Chen's dedication to his profession and his sense of responsibility, the Leijiang project would not have been able to go into production today. He is a key technical member of our Xinhai Group and the most dazzling light in the entire project."

As soon as he finished speaking, all eyes in the room instantly focused on Lin Chen.

Reporters' cameras all turned to him, flashes went off everywhere, illuminating his figure clearly. Lin Chen, standing at the end of the crowd, was suddenly caught off guard by the unexpected praise.

He could feel the envious, awe-inspiring, and jealous gazes directed at him from all around, as well as the approving looks from the construction workers. His cheeks flushed slightly, and his heart was filled with mixed emotions. This praise came so unexpectedly, yet it felt so heavy.

He was just doing what he was supposed to do, but in this absurd rush to finish the project, he became the most dazzling presence.

Tang Mingde's speech continued: "Lin Chen's deeds are the best embodiment of our Xinhai Group's philosophy of 'Quality First, People's Livelihood Foremost.' In the future, we will continue to value and cultivate talent, allowing more outstanding individuals like Lin Chen to emerge and contribute more high-quality projects to society. At the same time, we thank leaders at all levels for their care and support, and all the builders for their hard work!"

The applause erupted again, even more enthusiastic than before.

Next, Vice Minister Zhou took the stage to speak. He specifically mentioned: "I was deeply moved by the praise given to Engineer Lin Chen by Chairman Tang. The grassroots level needs such down-to-earth, hardworking, and highly skilled technical personnel. They are the guardians of engineering quality and the guarantors of people's well-being. I hope that Xinhai Group can cultivate more such talents, and I also hope that all builders can take Engineer Lin as an example and build every project into a high-quality project that can withstand the test of history and the people."

At 11:18, the host announced loudly, "The auspicious time has arrived! Now, let us give a warm round of applause to Vice Minister Zhou and Chairman Tang to jointly press the production start button!"

At Chairman Tang's signal, the host immediately stepped forward and respectfully helped Vice Minister Zhou, with Tang Mingde following closely behind.

They walked together to the launch platform in the center of the stage.

On the launch pad, a bright red button stood out prominently, with a countdown display below showing "3, 2, 1". The entire room fell silent instantly, all eyes fixed on that button.

"Three! Two! One!"

As the countdown ended, Vice Minister Zhou and Tang Mingde simultaneously pressed the button heavily.

Instantly, cannons roared, and colorful ribbons filled the sky. In the control room, operators started up the various devices one by one according to the preset program.

The water pump started running, emitting a dull roar, but mixed in with that roar was a faint, barely perceptible abnormal sound, like the groan of an old machine that could not bear the burden.

The floodgate symbolically raised a crack, and the turbid river water flowed slowly through. The indicator lights of the water purification system lit up green in unison, just like a torch being passed on.

Reporters frantically pressed their shutters, flashes going off everywhere, capturing this unprecedented scene.

On the live television broadcast, the dam appeared magnificent, the leaders were all smiles, and the workers were in high spirits. Everything seemed so perfect. No one knew how much unsavory history was buried within this seemingly successful commissioning.

The entire production process only lasted a little over an hour. Unfortunately, the production went very smoothly without any unexpected incidents. To be honest, Lin Chen's feelings were quite complicated.

After the ceremony, the leaders, surrounded by the crowd, visited the central control room and the flood discharge dam.

Finally, Vice Minister Zhou went over to Lin Chen and patted him on the shoulder: "Young Engineer Lin, you are young and promising. Keep up the good work. Your Chairman Tang can see that he values ​​you highly."

Lin Chen nodded blankly, "Okay." Tang Mingde smiled and said to him, "Lin Chen, take a few days to rest after production starts, and come see me at the provincial company then." Lin Chen hesitated for a moment before replying, "Okay."

Bi Wanqing squeezed next to Lin Chen, patted his shoulder, and said in a low voice with a smile, "Lin Chen, look, isn't this great? Everyone's happy, and you've become the biggest hero."

"A happy ending?" he repeated softly, his voice drowned out by the loud music. "Perhaps."

The production launch ceremony concluded under the warm midday sun.

Surrounded by the crowd, the leaders left one after another, and the black sedans drove away from the construction site in a grand procession, kicking up a cloud of dust.

The reporters, carrying "satisfactory" material, rushed back to their offices to finish their articles.

The potted plants that were temporarily placed there were carelessly discarded by the workers on the roadside. The water droplets on their leaves were quickly dried and left drooping. The bright red carpet was also rolled up, revealing the uneven road surface underneath.

After the excitement subsided, the construction site returned to its usual state, except for some traces of celebration and the remaining hidden dangers.

Lin Chen stood on the dam, watching the convoy gradually disappear into the distance, and then looked down at the dam beneath his feet.

The cold touch of cement came from the soles of his shoes, and he knew that this farce would eventually come to an end, and that the problems that had been deliberately ignored would eventually erupt in a more brutal way.

At that time, will those who stand on the stage today, full of vigor and confidence, still remember today's "grand occasion"?

The cold wind swept across the river again, creating ripples that stirred up waves in Lin Chen's heart as well.

He faced the wind, squinting slightly. In any case, he had done his best to stop this beautiful dream woven with power and interests. How long it could last depended on their fate.

>

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like