Zhao Tianming: "Factory manager, our technical team has been debugging these three problems for half a day, but we still have no clue what to do. The trade fair is getting closer and closer, and if we delay any longer, it may be too late!"

Lin Tian strode to the prototype station, bent down and carefully examined the deformed aluminum alloy frame, the messy remote control components, and the violently vibrating power assembly.

Looking at the weld seams on the fuselage, my mind instantly flashed through the complete set of practical experience in the research, development, debugging, and mass production of lightweight drones in later generations.

The common problems, causes of failure, and optimization solutions of various early drones have all come to light.

After thinking for a moment, Lin Tian said, "Don't worry, these three problems are common issues in early 1980s lightweight drones, not inherent flaws in the manufacturing process."

"We just used the old-fashioned approach of military welding, electrical control, and adaptation, which did not fit the development logic of light aircraft."

"I will explain the rectification plan to you one by one, and at the same time, I will directly complete the model upgrade and optimization."

"First, we need to solve the problem of welding deformation of the aluminum alloy frame." Lin Tian pointed to the slightly twisted frame and explained, "Aluminum alloy sheets conduct heat quickly and shrink unevenly after welding, so manual full welding will inevitably result in deformation."

"Next, we will switch to a multi-layer, multi-pass, segmented, staggered welding process, using low current and high welding speed to reduce heat input at single points and avoid local overheating and shrinkage."

"Deformed frames do not need to be scrapped; they are straightened using a combination of mechanical straightening and flame straightening."

"Use a small hydraulic jack in the workshop to apply reverse pressure for fixation, apply strip low-temperature heating to the deformed protrusion, control the temperature to within 600 degrees Celsius, allow it to cool and solidify naturally, and accurately correct the flatness of the frame."

"For all new machine frames going forward, reverse pre-deformation will be carried out before welding, and rigid fixation will be achieved with tooling fixtures."

"To eliminate the problems of welding deformation and fuselage imbalance at the source."

"At the same time, I optimized the frame structure and added four lightweight reinforcing ribs. This does not increase weight or obstruct wind resistance, but also improves the overall rigidity of the machine, directly upgrading its wind resistance stability by one level."

"Secondly, we need to address the issues of poor anti-interference, drift, and disconnection of the remote control signal."

Lin Tian methodically deployed the plan: "The power frequency electromagnetic interference from machine tools and circuit equipment in the workshop is the biggest nemesis of early radio remote control."

"Immediately install a metal shield and filter capacitor on the entire remote control system to isolate electromagnetic interference from the workshop."

"At the same time, we abandoned the single fixed frequency band signal, upgraded the dual-band switching remote control module, reserved the signal gain antenna interface, and enhanced the stability of low-altitude signals."

"In addition, the control program has been optimized and a signal fault tolerance mechanism has been added. In the event of a brief disconnection or delay, the system will automatically lock and hover smoothly to prevent loss of control and crash, thus fixing the biggest security vulnerability of the first-generation model."

"Subsequent test flights and outdoor operations are completely unaffected by the industrial electromagnetic environment, and the control precision has been greatly improved."

"Finally, the problems of power mismatch and severe fuselage vibration were resolved."

"The parameters of the purchased engine are fine; the problem lies in the lack of transmission compatibility and shock absorption structure."

Lin Tian: "First, we will re-polish the propeller's dynamic balance with precision, correct the slight curvature error of the blades, and eliminate the eccentric vibration during high-speed rotation."

"Secondly, at the connection point between the engine and the fuselage, a silicone-metal composite shock-absorbing pad, which is now mature in this field, is installed to cut off the transmission of power vibration to the fuselage."

"Third, fine-tune the engine fuel supply parameters and transmission gear ratios to match the propeller speed and optimize fuel injection efficiency to solve the problems of fluctuating power and excessive fuel consumption."

"At the same time, we upgraded the lightweight transmission components to reduce power loss and make the overall power output of the machine more linear and stable."

After explaining the complete revision plan, Lin Tian added several advanced upgrade details to adapt to civilian scenarios: "We will also make three practical upgrades to adapt to trade fair displays and subsequent civilian operations."

"First, a simple level stabilizer is installed to achieve one-click leveling and lower the barrier to operation."

"Secondly, we will optimize the overall wiring layout, organize the circuits, and ensure proper insulation to improve the durability of the equipment."

"Third, we fine-tuned the aerodynamic curvature of the fuselage to reduce low-altitude wind resistance and increase flight time, extending the original 90-minute flight time to about 100 minutes."

A detailed, precise, and comprehensive solution was implemented.

Every detail accurately pinpointed the root cause of the malfunction, and the product was successfully iterated, far exceeding everyone's understanding and imagination.

Zhao Tianming stood there, dumbfounded, and it took him a long time to come to his senses: "Factory Manager, you're really something!"

"A group of us veteran technicians spent the whole day circling around the machine, checking the process thoroughly and repeatedly debugging, but we still couldn't solve the problem no matter how hard we racked our brains."

"You came in and immediately saw the crux of the problem, provided a complete and perfect solution in just a few words, and even upgraded and optimized the machine while you were at it!"

"That's absolutely amazing!"

"Enough with the praise, get on with the implementation as soon as possible, and strictly follow the process standards I've outlined for every step. There can be no room for error!"

"Yes, factory manager! We guarantee quality and quantity, and that all rectifications are completed on time!"

Subsequently, Lin Tian personally led Zhao Tianming to settle in the trial production station, followed up on the rectification and debugging throughout the process, and personally controlled every detail of the process.

The two men first dealt with the deforming frame, while Zhao Tianming led a team to set up hydraulic tooling fixtures.

Lin Tian personally controlled the temperature and pressure of the low-temperature flame straightening process to precisely correct the twisted parts of the frame.

After the machine body was completely flat, Lin Tian instructed the workers to use a segmented staggered welding method to reinforce the subsequent frames.

Lightweight reinforcing ribs were added simultaneously to completely eliminate the risk of fuselage deformation and imbalance.

The next step was to rectify the electronic control system.

Lin Tian personally selected suitable filter capacitors and alloy shielding covers, and guided the workers to accurately solder the circuits and neatly route the wires.

Modify the dual-band remote control module.

Adjust the signal gain parameters.

The workshop's machine tools and electrical equipment were repeatedly turned on to simulate a complex electromagnetic environment, and the remote control signal was tested multiple times.

Eliminating signal delay, drift, and disconnection issues significantly improves control response speed and stability.

Finally, we tackled the challenge of powertrain compatibility.

Lin Tian personally went up on the machine to polish the propeller's dynamic balance, meticulously corrected the blade curvature error, and installed the shock absorption components one by one.

The engine fuel supply and gear transmission ratio were repeatedly adjusted, and the engine was started and tested multiple times.

A little bit of calibration of the power output parameters.

The previously severe fuselage vibrations have completely disappeared, the power output is smooth and linear, fuel consumption has returned to the standard range, and the safety hazards of the test flight have been completely eliminated.

After three hours of intensive work throughout the night, all faults were completely resolved, and the first-generation civilian drone, after its iterative upgrade, was completely transformed.

The machine body is flat, stable, and extremely rigid, with precise and sensitive signal control that is immune to electromagnetic interference.

With stable and balanced power output and minimal vibration, the vehicle offers comprehensive upgrades in range, stability, safety, and practicality.

Its overall performance far exceeds the original design standards, fully meeting all the needs of exhibitions, field test flights, and civilian operations.

Looking at the finished drone, now fully tested and operating at peak performance, Zhao Tianming felt much more at ease: "Factory manager, the drone is all tested and all parameters meet the standards. It's ready for test flights and exhibitions at any time!"

"With this machine at the trade fair, our Hongxing factory will definitely make a splash!"

Lin Tian bent down to check the overall parameters one last time. After confirming that there were no flaws, he nodded slightly, a look of certainty flashing in his eyes.

"The subsequent assembly, detail finishing, and trial production are your responsibility. Keep a close eye on the processes to ensure all finished products are flawless, and give it your all for the trade fair!"

"Don't worry, factory manager, I guarantee the task will be completed!"

After making his arrangements, Lin Tian left the car.

The biggest problem right now is the multi-million dollar funding gap for the joint venture project.

With Hong Kong investment temporarily suspended, the expansion of the factory and the mass production of new products all require substantial financial support, which cannot be delayed.

After a brief preparation, Lin Tian got up and headed to the Hangzhou Bank headquarters.

Just then, Su Qing strode in: "Factory Manager, good news..."

……

Tap the screen to use advanced tools Tip: You can use left and right keyboard keys to browse between chapters.

You'll Also Like